Download Benq MX662

Transcript
5.3 Module Assembly
Assembly Key Point - Optical Engine
1. Light Pipe Module assembly and overfill alignment
1.1 Assembly LP Module to HSG DMD
i.
ii.
iii.
Assembly “Clip LP” and lock with screw well (Fig. 1-2).
Press CLIP of RE_BKT_LP first, and then push it into the hole (Fig. 1-3).
Placed LP Module on LP datum of “DMD HSG” and adjustment screw well, shown(Fig. 1-4).
iv.
v.
Assembly “Baffle LP” first (Fig. 1-5) & push “Baffle LP” to hook DMD HSG(Fig. 1-6),
When Lock the screw of Baffle LP ,the hand must push the left corner of Baffle LP before (Fig.
1-7),.
vi.
vii.
Lock the screw of Baffle LP well then release the hand (Fig. 1-8),
Assembly two Overfill adjustment screws (M2, 8L) to HSG DMD (Fig. 1-1).
** Adjustment criteria refer to below item 1.2
1.2 Overfill Adjustment @ LP Module
Overfill Adjustment Criteria:
i.
ii.
Pre-assembly 2 adjusting screws.
Alignment Sequence:
a.
To adjust “Horizontal Adjustment Screw” firstly, and then “Vertical Adjustment Screw”.
(Based on production line condition, OE could change the sequence)
1.3 For Overfill Re-adjustment:
a.
Loosen two adjustment screws
b.
Follow adjustment steps shown in Item 1.2-ii.
Overfill Vertical
Adjustment Screw
M2, 8L
Overfill Horizontal
Adjustment Screw
M2, 8L
Fig. 1-1
80