Download EBENCH KH 2330 Specifications
Transcript
TM 9-2330-384-14&P 1-7. LOCATION AND DESCRIPTION OF MAJOR COMPONENTS (Con't). TOP VIEW KEY NAME FUNCTION 34 Front Dam Contains fuel in event of fuel spillage. 35 Vent Cap Access port for cleaning tank interior. In the event of fire, fusible cap melts to provide tank venting. 36 Walkway Nonskid surface on top of semitrailer. 37 Valve opens to allow venting of vapors created during bottom loading and unloading. Vapor Vent 38 Manhole Allows access to inside of tank. Fuel is top loaded through 10 in. (25.4 cm) fill cover. Closure is by means of self-latching catches. 39 Rear Dam Contains fuel in event of fuel spillage. 40 Overturn Rails Protect manhole and vapor vent from damage in case of an overturn accident. Also help contain fuel spillage. Roadside overturn rail is part of vapor collection system. 41 Vapor Vent Hose Provides airtight connection between vapor vent and roadside overturn rail. 6 Grounding Stud Unpainted ball used to attach grounding cable. 7 Emergency Valve Remote Trip-Release Closes emergency valve from top of semitrailer. 1-8
Related documents
TM 5-3805-264-14&P - Liberated Manuals
TM 9-2510-247-13&P - Liberated Manuals
including repair parts and special tools list for
TM 11862A-OR SHELTER EXPANDABLE
trailer, ammunition, heavy expanded mobility, 11 ton, m989 (2330
TM-1-1740-204-13-and-P
tm 55-1560-307-13&p technical manual operator
TB 11-5830-263-20-1
Parte No. 213320-4 Instrucciones de Operación y Mantenimiento