Download Craftsman 113.299112 Specifications
Transcript
5. Slide assembly to the left until it is 4" from the extension table. Adjust the extension table brackets against the back of the front guide bar and then finger tighten the two nuts. 6. Check dimension from side of right extension to le_t side of channel at front guide bar and rear guide bar, Adjust to insure both dimensions are identical. / ii 7. Lay a framing square from the right extension to the separator channel at the frontof the saw. When lined up. tighten two front nuts. '3 8. Same procedure as above is required at the rear of the saw. 9. Slide fence to right, over separator channel. Fence channel should clear separator channel. Feeler gauge for checking clearance can be created by cutting a piece of newspaper in 16 pieces 4" square, Stack eight pieces at front of channel and eight pieces at rear of channel. Fence should have just enough clearance to slide back and forth over paper stack. Adjust to obtair proper clearance. Tighter all nuts holding the separator channel in place. Tighten nuts to secure bracket to rails then tighten nuts to secure bracket to separator channel. RiP FENCE AUGNMENT RIGHT EXTENSION FRAMING ADJUSTMENT WARNING: A misaligned fence can cause kickbacks and jams, To avoid injury, follow these instructions until the fence is properly aligned. GROOVE 1. The rip fence must be PARALLEL with the sawblade and Miter Gauge Grooves. Clean any debris off the fence rail. Move Fence until it is along side of Groove. DO NOT LOCK IT. It should be parallel to Groove. If it is not: A. Using a hex "L" wrench, loosen the four fiat head screws located to each side of the rip fence handle, B. Hold fence head tightly against from guide bar Align fence channel so that it is parallel With groove. C. Alternately tigtiten the screws. D. Recheck alignment. E. Repeat steps as needed until fence channel is aligned with miter gauge groove. FLAT HEAD SCREWS FOR ADJUSTING FENCE PARALLELISM 26