Download Zhone 4821-A2 Installation guide
Transcript
2. Cabling 6. Secure the cables as required for strain relief. 10/100BaseT Uplink (Port 2) Port 2 is the uplink for the DSLAM. A straight-through cable can be used regardless of the destination interface, since the port automatically distinguishes between an MDI and an MDIX. Procedure To use Port 2 as the uplink: 1. Connect an 8-position modular cable to Port 2. 2. Connect the other end of the cable to the uplink interface, such as an Ethernet switch. 4821-A2-GN21-10 July 2004 2-3