Download Sears 9MPD Specifications

Transcript
START−UP CHECK SHEET
For 90+ Furnace
(This sheet is optional. Keep this page for future reference.)
Date of Start−Up:
Calculated Firing Rate:(See Checks and Adjustments
Section).
Dealer Name:
Heating Check
Address:
City, State(Province), Zip or Postal Code:
Measured Line Pressure when Firing Unit:
Measured Manifold Gas Pressure:
Phone:
Temperature of Supply Air:
(°)
Owner Name:
Temperature of Return Air:
(°)
Address:
Temperature Rise (supply−return temperature): (°)
City, State(Province), Zip or Postal Code:
In Rise (see furnace rating plate)?
(°)
Static Pressure (Ducts): Supply Air
Return
Model Number:
Which blower speed tap is used? (Heating)
Serial Number:
Optional Check: CO ?
Setup Checks
Cooling Check
Check the box when task is complete
All Electrical Connections Tight?
Have hoses been relocated for furnace application
(upflow/horizontal)?
CO2 ?
Temperature of Supply Air:
(°)
Temperature of Return Air:
(°)
Temperature Difference:
(°)
Static Pressure (Ducts) cooling: Supply Air
Condensate Drain Connected?
Blower Speed Tap used for cooling:
Condensate Drain Trapped?
Dealer Comments:
Return
_______
Manual Gas Shut−Off Upstream of Furnace/Drip−Leg?
Gas Valve turned ON?
Type of Gas:
Natural:
Propane:
Filter Type and Size:
3
Specifications are subject to change without notice.
440 01 1024 04