Download Bosch LBB 1925 Operating instructions

Transcript
Plena System Pre-amplifier | Installation and Operating Manual | External settings and connections
4
en | 13
External settings and connections (system pre-amplifier)
4.1 Connect the DC supply (battery)
6
Call
Activ
e Ca
ll In
Appa
ra
conn tus deliv
ere
ected
for 2 d
30V-
In
00V
0
Zone
100V
115V
- 23
0
Tel/E
3
Zone
4
100V
0 1
00V
0
DC O
ut
DC In
/Line
MG
Trigge
r1
Trigge
r2
LBB1
925/0
8900
0
115/21925 0005
30V~
No.
,50/6
0Hz
0
1.Au
dio+
2.0V
5.Allc
all
3.Au
dio- 6.Data4.24V
7.Da
ta+
d.c.
8.Ch
s.GN
/Line
14
3
5
PCAu
D
dioIn
RS23
3
2
5
2
Zone
2
6
8
5
2
1
R
3
GND
1
GND
1
-
+
100V
2
Zone
3
4
Activ
e Call
Appa
ratus
conn
ected delivered
for 230V
- 115V
- 230V
-
In
In
100V
Zone
0
2
Zone
100V
3
Zone
0
4
100V
DC Out
0
100V
0
100V
0
100V
0
DC In
0
+24V
-
+24V
-
Rated
input
Power
:
T1.0A 50VA
L 250V
Warni
ng
0
This
+24V
-
+
Call
0
1
ut
100V
0
6
Aux
+
7
3
Out
100V
12 V
D
5
L
4
MasterO
0V
Zone
CD
1
+24V
-
Warni
ng
This
appa
ratus
-
must
be
appara
tus must
be earthe
d
earth
ed
F
F = 1.5A
+
-
C
12 V
D
C
Figure 4.1
The system pre-amplifier has a 24 Vdc input (terminal screw), which you can use to connect a back up power
supply, e.g. batteries. You can earth the unit to increase the electrical stability of the system.
Caution
The connection cable must have an in-line fuse. Use the type of fuse as mentioned in the illustration.
Bosch Security Systems | 2003-09 | 3922 988 99483en