Download ISTAR Evaluation - Software Engineering Institute
Transcript
F15 How easily do the generic experiments map onto environment operations? Not easily. The problems are as follows: • There is no notion of baseline. • There is no notion of product release. • There is no notion of check-in/check-out. • The build tool is divorced from the component management system and does not support Ada. C.2.2. Performance Questions Timing figures are given in seconds. Each entry represents a distinct trial. Space figures are given in the form xxK(yy), where xx represents space in the UNIX file system and yy represents ISTAR database records. P1a Elapsed time of fundamental CM operations: Create CM element. Create Configuration Item (CI). This is normally done within the Component Management Tool. Enter CMT 8,8,12,12 Create CI 6 (Empty CI, i.e., with no transfer items) Commit CMT changes 7,7,12,11,8 Exit CMT 10,12 Commit and Exit in one operation 15 Create Transfer Item (XI). This can only be done by exporting from a workbench. The following timings are from the Ada workbench. Export 2,12,9,13,13,11,15,10,16,15,15, 17,15,15,16 168 CMU/SEI-88-TR-3