Download File - SDProget
Transcript
2 . 3 T h e J o b O rd e r For the purposes of the program, all drawings and documents belonging to the same job belong to the same job order. The job order is, consequently, a directory that contains all the files necessary to draw up a specific electrical design. The most important files in the order are the drawings (files with .DWG extension); each drawing file is identified by the name of the multisheet (see Sect. 2.4). For each new job order, a new directory is created automatically, with the same name as specified by the user (20 characters max.). The new directory is created in the "Job Order Path" specified during installation. Position of example Job Order The drawing file path can only be modified through the specific function “Job order Path”. To correctly view the list of job orders indicated in the figure (Example, ProjectA, ProjectB etc...) the Path has been set up in “Spac Automazione\Commesse”. Example Job Order Structure This structure is managed by the specific command “2.5 Job Order management”. Job Order Multisheets (dwg files) Description EXAMPLE 1° multisheet: Schema.dwg Electrical scheme 2° multisheet: Layout.dwg Cabinet \ Pushbuttons topography 3° multisheet: Liste.dwg Material list and BOM 4° multisheet: Opzioni Macchina.dwg Machinery Configurator sample WARNING: If drawings are moved manually to other folders (or sub-folders) they are no longer visible through the function “Job Order Management”. 2 Basics • 33
Related documents
Manuale di SPAC Automazione Release 2015
User Manual of SPAC Start 16
Manuale Spac Automazione 2005
Spac Automazione 2013 - User manual
Manuale di SPAC Automazione Release 2013
Manuale di SPAC Start 16
Spac Start 2008 - Manuale d`uso
COMET-AR User`s Manual
Spac Automazione 2011 - User manual
Spac Start 2005
Manuale di SPAC Start 2013
Scarica l`allegato