RailCorp Engineering Manual — Track
Rail Defects and Testing
TMC 224
Document control
Revision
Date of Approval
4.5
August, 2011
4.4
February, 2011
New C6-6 Testing of Rail Bond Welds; C-7, C6-8 and C6-9
renumbered; App 3 - Welding Return - only closures less than 6m
in length need be crowed.
4.3
July 2010
C2-4.1 – New section dealing with management of defects in
special track work; C4-4.2 – Additional treatment for squat
laminations associated with wirefeed welds; C4-6 Changed detail in
DWFW defect responses; Addition of requirements for retesting;
C5-1 – Addition of note regarding shorting of track circuits; C6-1 –
Addition of note regarding shorting of track circuits; C7-1 – Addition
of note regarding shorting of track circuits; New C17-4 – Calibration
of Bolt testing probe; C17-5 renumbered; Appendix 3 – Additional
Welding Return Form WR2 to suit manual entry of data
4.2
December, 2009
Format change; Title changes to reflect organisation change; C4-2
- Added Straightness requirement; C4-2 Add restriction on
aluminothermic welds sitting on track slabs
4.1
December, 2008
Chapter 1 - Additional reference; Added requirements in Section
C2-1.2 for turning off lubricators prior to testing runs; Additional
Testing requirements for Defective wire Feed Welds in Section C4­
6 Internal Rail Defects; Added requirement to inspect monobloc
crossings in Section C7-1; Additional Testing requirements for
Defective wire Feed Welds in Section C10-13 Sizing Chart;
Chapter 14 - Added Defect Size Coding; New Chapter17 –
Ultrasonic Testing of Bolts. Includes content of CTN 08/07; New
Chapter 18 – Visual Inspection of Monobloc crossings. Includes
content of CTN 08/05; Added Defect Size coding to Form WAF 1
4.0
May, 2008
C1 - Additional reference added; C5-4 - Clarification of application
of alignment testing to flashbutt welds; C9-1.2 Reference to
Australian Standard added.
3.0
October,2007
Addition of damage limits for foot damage, welds close to welds
and joints and short closures
2.0
April, 2007
Inclusion of restriction on welder testing own welds; refinement of
CME accountabilities for defect assessment and review; Minor
corrections; revision of definition of TDX; inclusion of upgraded
defect limits and responses for alignment defects; revision of defect
limits for VSH defects. Revision of definition of HSH; Relaxation of
restriction on welding near heat numbers in new rail; inclusion of
method for measuring punch marks; Additional guidance on squat
testing; testing of wirefeed in plain track; guidance on marking of
testing; Extended area and type of testing; additional guidance on
testing for crack predictors; removed requirement to dye test nonbearing part of switch; Additional guidance on gassing defects;
addition of guidelines for setting up 0° probe for testing defect
depth; Revision of defect limits for VSH defects; Revision to reflect
changes of form
1.0
October,2006
First issue as a RailCorp document. Includes content from C
2405, C 2406, C 2408, C 3210, AP 5373, AP 5374, RC.2407,
RC.2408, RC.2410, RTS.3733, RAP.5374, RAP.5393, CTN 01/08,
CTN 01/11, CTN 02/01, CTN 02/03, CTN 02/06, CTN 04/25, CTN
05/02, CTN 05/25, CTN 05/26, CTN 06/06, CTN 06/20, CTN 06/08
© Rail Corporation
Issued August 2011
Summary of change
Changes detailed in Chapter Revisions
UNCONTROLLED WHEN PRINTED
Control Pages – Page 2 of 1
Version 4.5