Download TMC 224 - Rail defects and testing
Transcript
RailCorp Engineering Manual — Track Rail Defects and Testing TMC 224 Document control Revision Date of Approval 4.5 August, 2011 4.4 February, 2011 New C6-6 Testing of Rail Bond Welds; C-7, C6-8 and C6-9 renumbered; App 3 - Welding Return - only closures less than 6m in length need be crowed. 4.3 July 2010 C2-4.1 – New section dealing with management of defects in special track work; C4-4.2 – Additional treatment for squat laminations associated with wirefeed welds; C4-6 Changed detail in DWFW defect responses; Addition of requirements for retesting; C5-1 – Addition of note regarding shorting of track circuits; C6-1 – Addition of note regarding shorting of track circuits; C7-1 – Addition of note regarding shorting of track circuits; New C17-4 – Calibration of Bolt testing probe; C17-5 renumbered; Appendix 3 – Additional Welding Return Form WR2 to suit manual entry of data 4.2 December, 2009 Format change; Title changes to reflect organisation change; C4-2 - Added Straightness requirement; C4-2 Add restriction on aluminothermic welds sitting on track slabs 4.1 December, 2008 Chapter 1 - Additional reference; Added requirements in Section C2-1.2 for turning off lubricators prior to testing runs; Additional Testing requirements for Defective wire Feed Welds in Section C4 6 Internal Rail Defects; Added requirement to inspect monobloc crossings in Section C7-1; Additional Testing requirements for Defective wire Feed Welds in Section C10-13 Sizing Chart; Chapter 14 - Added Defect Size Coding; New Chapter17 – Ultrasonic Testing of Bolts. Includes content of CTN 08/07; New Chapter 18 – Visual Inspection of Monobloc crossings. Includes content of CTN 08/05; Added Defect Size coding to Form WAF 1 4.0 May, 2008 C1 - Additional reference added; C5-4 - Clarification of application of alignment testing to flashbutt welds; C9-1.2 Reference to Australian Standard added. 3.0 October,2007 Addition of damage limits for foot damage, welds close to welds and joints and short closures 2.0 April, 2007 Inclusion of restriction on welder testing own welds; refinement of CME accountabilities for defect assessment and review; Minor corrections; revision of definition of TDX; inclusion of upgraded defect limits and responses for alignment defects; revision of defect limits for VSH defects. Revision of definition of HSH; Relaxation of restriction on welding near heat numbers in new rail; inclusion of method for measuring punch marks; Additional guidance on squat testing; testing of wirefeed in plain track; guidance on marking of testing; Extended area and type of testing; additional guidance on testing for crack predictors; removed requirement to dye test nonbearing part of switch; Additional guidance on gassing defects; addition of guidelines for setting up 0° probe for testing defect depth; Revision of defect limits for VSH defects; Revision to reflect changes of form 1.0 October,2006 First issue as a RailCorp document. Includes content from C 2405, C 2406, C 2408, C 3210, AP 5373, AP 5374, RC.2407, RC.2408, RC.2410, RTS.3733, RAP.5374, RAP.5393, CTN 01/08, CTN 01/11, CTN 02/01, CTN 02/03, CTN 02/06, CTN 04/25, CTN 05/02, CTN 05/25, CTN 05/26, CTN 06/06, CTN 06/20, CTN 06/08 © Rail Corporation Issued August 2011 Summary of change Changes detailed in Chapter Revisions UNCONTROLLED WHEN PRINTED Control Pages – Page 2 of 1 Version 4.5