Download Web-based Bug Tracking Solutions Project`s Paper
Transcript
Introduction This way of developing software has advantages, as it produces working software earlier and quicker, it is more flexible, easier to test and debug and each iteration is easier to manage. The problems over this methodology are the rigidness of their iterations (they do not overlap over each other) and not all requirements are gathered beforehand which may lead to architectural problems. Illustration 1.1: Iterative Development Process 1.6 The Client Vetura Group (Fabio Lucci – Tati – Tony Boy), is one of the pioneers of the “non food hard-discount” retail industry in France, with a turnover exceeding €350 million. With over 1500 employees, the group is present in France and Portugal and will soon be opening in Spain, to give it in an excess of 130 owned stores. In June 2003, one of the major players in the clothing and shoe industry, the ERAM Group, joined Vetura in order to expand the business and their market offer. This was part of Vetura’s strategic development using both organic or non organic growth. One of the best examples is Vetura’s acquisition of TATI, in August 2004. The total group revenues represent some €2 Billion. In September 2005, Vetura selected Enabler to perform an analysis of its IT systems and to start a "fit & gap analysis" with regard to the Oracle Retail solution. As a result of this gap analysis they confirmed at the end of 2005 that they had selected both the Oracle Retail Solution and, at the time, Enabler. 1.6.1 History The major goal of Vetware’s project is to provide Vetura with an integrated system which should be able to meet the company’s following objectives: ● Maintain growth by the adoption of the world’s best retail practices ● Increase its capacity to “push” sales and internal process ● Keep the pace with its future organic and non organic growth The scope includes the end to end commercial process (buying, trading, inventory, distribution and sales audit) with the complete change of the internal legacy system running under AS400. The RMS, RTM, Allocations, ReSA and RIB modules are part of this first project, which was kicked off in January 2006. 5