Results
5 Results
There were four milestones in this project corresponding to its most delicate phases.
Firstly, by the end of March the first appearance of Mantis on a production server available
Wipro Retail domain and its following all-day session, including an introduction to the Mantis
system, training on his use and preliminary tests, was without doubt the most vital step on the
projects development cycle, especially due to the Testing Services Team contribution on further
requirements analysis and system failures detection. Everybody, recognized Mantis' potential
but further developments were needed in order the system to be fully adapted to Wipro's Retail
processes.
Secondly, another training session with the all the on-site available Testing Services Team,
more focused, this time, on volume/load/performance tests was scheduled for 15th of April.
This session had extra importance, more confidence and support over the tool was needed and,
after a big cycle of development and tests, I felt this was the best opportunity to guarantee the
recognition of our project.
The session ended with a supportive thumbs-up from all team members who tested the
entire system, with especial focus in the areas directly affected by the developments. Mainly
improvements were proposed, which were fully achieved in the final development cycle before
my and Enabler Mantis joining VetLog Project.
The pilot run at Vetlog Project was also an important date, requiring some final
refinements and, the natural, project set up of Enabler Mantis system. Before this happening, a
morning presentation session took place with all Vetura VetLog Team enabling them to contact
the new tool and receive some training over its use. This morning meeting, ended up with the
some resistance and my respective resilience accordingly.
Finally, the project management decided to use Enabler Mantis at the client's site and,
therefore, public accesses to Mantis directly through Internet were granted by the IT Services
and myself.
This final milestone provided a crucial predictability that this project can have a greater
impact on how Wipro's Retail faces error management.
Currently the system is being used by 15 people, including VetLog's Team, Test Services
Team and Vetura's collaborators, with users being added to the system almost every week. Till