Download I-Site Manual - version 2
Transcript
Section 6 : Preparing the Readout for Use Before embarking on a visit to site to take a series of readings it is important to ensure that the readout is properly prepared as follows; 1. Ensure that all items are available i.e. Readout, pneumatic flyleads, cleaning materials for cleaning couplings and notepad/pencil for recording readings. 2. The internal Nitrogen cylinders must be sufficiently charged to ensure enough gas is available for the readings to be taken (refer to Section 7 for charging details). In case of high pressure readings greater quantity of gas per reading will be consumed. A careful planning of recharging the gas cylinders is advised to save trips back to base especially over long distances. User Manual 8