Download Manual - RK2 Systems
Transcript
PlUMBInG cOnnEcTIOns Full Flow Plumbing Connections Refertothe‘FullFlowInstallation’diagramonthenextpageandfollowtheinstructionsbelowiftheozoneisbeinginjected directlyintothefullflowofthepool’sreturnline: 1.Tapintothereturnlineafterthepump,filter,andheater.Theozoneinjectionpointshouldbethelastcomponentinlineand asfaraspossiblefromtheresidualsanitizerinjectionpoint. 2. Glueintheproperinjector,notingthedirectionofflow(indicatedbyanarrowontheinjector). 3.Oncetheinjectorisinstalled,thevacuummaybeadjustedasdescribedinthe“ozonegeneratoroperation”section.Ifthe systemisequippedwiththeoptionalelectricalinterlockbox,thevacuumcanbeobservedontheVAC/PSIgaugelocated abovetheSCFHgaugeontheelectricalinterlockbox. Note: The ozone generator will only energize for 15 seconds or until a vacuum is attained. Tubing Installation 1.Install braidedtubingfromtheairdryertotheAIRINLETfittingonthebottomoftheozonegenerator(orthebottomofthe electricalinterlockboxifsoequipped).Ifyouarenotusinganelectricalinterlockbox,skipStep2andgotoStep3. 2.Ifequippedwiththeelectricalinterlockbox,continuerunningthebraidedtubingfromtheelectricalinterlockboxtothe brassbarbfittingonthebottomoftheozonegenerator. 3.Installthecheckvalveassemblyintotheinjector.Connectthe1/4”Teflon®tubingfromtheOZONEOUTfittingonthe bottomoftheozonegeneratortothecheckvalveassemblyontheinjector.Securebytighteningthefittingaroundthe 1/4”Teflon®tubingafterinsertion.(Ifequippedwiththeelectricalinterlockbox,installthe1/4”Teflon® tubing from theOZONEOUTfittingonthebottomoftheozone generatortothestainlesssteelsolenoidvalvelocatedonthetopofthe electricalinterlockbox.ContinuerunningtheTeflon®linefromthesolenoidvalvetothecheckvalveassemblyonthe injector. Independent Ozone Loop Plumbing Connections Refertodiagrams(pgs7-8)andfollowtheinstructionsbelowiftheozoneisbeinginjectedintoanindependentozoneloop. Ifcircumstancesallow(newconstruction,pre-plumbedforanozoneloop),theidealconfigurationisfortheozonelooptobecompletelyindependentfromthepool’scirculationsystem.Otherwise,thefeedwaterforthesidestreamispulledfromthemainreturn before the circulation pump and returned at a point afterthefilterandheater.Thisisdonesotheboosterpumpisnotattemptingto drawwaterthroughthefilterandfromthecirculationpumpwhenthecirculationpumpisnotoperating.ThepHadjustmentpoint will always be the last item in this sequence. UseSchedule80PVCforplumbingconnectionswhenpossible.Itisrecommendedthatunionsandvalvesareusedwherepractical. Ozone rapidly deteriorates many compounds; the following is a list of materials that may be used with ozone in an aqueous solution. VitonTeflon®Sch.40PVCStainlessSteel EPDM Silicon Kynar Sch.80PVCConcrete Hepalon NOTE: Be sure to use good plumbing practices and install unions and isolation valves wherever the situation dictates, i.e. pump removal, etc. Secure all plumbing with unistrut or similar hardware. 1. Inthemainwaterreturnline,beforethecirculationpump(orapre-plumbedindependentsuctionfittingifnewconstruction) installateeandanisolationvalve. 2. Install the booster pump. Secure the pump on a housekeeping pad with the appropriate mounting hardware. 3. Ifanauxiliarycontrolrelay(i.e.flowswitch)isbeingused,installitintothelineaftertheozoneboosterpump. 4. Installtheinjectormanifoldaftertheozoneboosterpump,makingsuretonotethecorrectflowdirectionoftheinjector manifold.Removethetiewrapsthatsecurethecheckvalveassemblytotheinjectormanifoldandthreadthecheck valveassemblyontotheopeningoftheventuri. 12