Download Important - Advanced Energy
Transcript
Advanced Energy Air filters 4680 Figure 4‑11. Air filter check This completes the pre-installation inspections. LIFTING AND MOUNTING THE INVERTER The inverter base is designed to allow a properly rated forklift to lift it from the front or back using the fork slots. ☞ Important Before installing the inverter, make sure the pre-installation inspection steps have been completed and no issues have been identified. Mounting Requirements When mounting the inverter, consider the following requirements: • Mount the unit on a flat surface in an upright position. • The mounting surface must comply with all national and local standards for weight, seismic, and wind sheer requirements. • The mounting surface must be prepared according to the site specific structural drawing. Required Tools • Lifting device such as forklift or a crane may be used to lift and position the inverter. Lifting devices must be rated for 4,140 kgs (9,100 lbs). Proper lifting methods may include: ◦ Using a crane with a strap rated for the weight of the inverter 4‑10 Installing 570-1001791-05A