ACTIVITY
UT
DURATION
TIME FROM
PERIGEE
EVENT/ACTIVITY
TEAM
GS
2002-10-25 01:40:00
0:01:00
P2 + 55:30:46
Reset RMU integrator and start the RMU calibration.
F.D.M.
G
2002-10-25 01:41:00
0:43:00
P2 + 55:31:46
Spare - Night Time
F.D.M.
G
FD/PG
FD to process the RMU TM and
calculate the drift
FCP Reference / Notes
PST
BCP
Pnt Nr
Timeline revs 1-6 issue 3 ver 2
FCP_AOC_0550: RMU Null Bias Calibration
At the end of this activity, JEMX1 is left in Data
Taking for min 24hr, before proceeding with JEMX2.
Inform JEMX PI of any attitude change during this
period
2002-10-25 02:24:00
2002-10-25 02:24:00
2002-10-25 02:29:00
0:00:00
0:05:00
0:41:00
P2 + 56:14:46
P2 + 56:14:46
P2 + 56:19:46
J.Pineiro on shift [~7hr]
Uplink RMU drift correction.
Spare - Night Time
J.P.
J.P.
J.P.
G
G
G
2002-10-25 03:10:00
0:15:00
P2 + 57:00:46
IMU -1 and IMU-4 power on for warm-up, IMU selection in ACC and FDE.
J.P.
G
2002-10-25 03:25:00
0:30:00
P2 + 57:15:46
Spare - IMU Warming-up time.
J.P.
G
2002-10-25 03:55:00
0:40:00
P2 + 57:45:46
RWB.
J.P.
G
2002-10-25
2002-10-25
2002-10-25
2002-10-25
2002-10-25
2002-10-25
04:35:00
04:50:00
04:55:00
05:25:00
05:25:00
05:55:00
0:15:00
0:05:00
0:30:00
0:00:00
0:30:00
0:30:00
P2
P2
P2
P2
P2
P2
H/O Goldstone to Perth.
Start of IMU + RMU calibration
Spare Time (data collection).
LOS Goldstone.
Spare Time (data collection).
J.P.
J.P.
J.P.
J.P.
J.P.
P-G
P
P
P
P
2002-10-25 06:25:00
0:25:00
P2 + 60:15:46
Uplink of the drift correction (IMU + RMU)
J.P.
P
2002-10-25 06:50:00
0:30:00
P2 + 60:40:46
FDE configuration for the PP.
J.P.
P
2002-10-25 07:20:00
2002-10-25 08:00:00
2002-10-25 08:25:00
0:40:00
0:25:00
0:42:00
P2 + 61:10:46
P2 + 61:50:46
P2 + 62:15:46
Spare time
Start of AOCS PP. The PP period is 10 hours.
Spare time
P
P
P
2002-10-25 09:07:00
0:00:00
P2 + 62:57:46
R.Southworth, F.Cordero on shift [~7.5hr]
J.P.
J.P.
J.P.
F.C.
R.S.
2002-10-25 09:07:00
0:00:00
P2 + 62:57:46
AOS TM Redu. This a a short, low elevation pass (6 degrees maximum). It is only scheduled
in order to give some "contingency" window in case of a Perth failure. The exact times are:
> 09:07:25 AOS TM
> 09:40:08 AOS TC
R.S.
P-(R
TM)
2002-10-25
2002-10-25
2002-10-25
2002-10-25
2002-10-25
2002-10-25
2002-10-25
09:07:00
09:22:00
10:07:20
10:07:20
10:12:20
10:35:00
10:35:00
0:15:00
0:45:20
0:00:00
0:05:00
0:22:40
0:00:00
2:00:00
P2
P2
P2
P2
P2
P2
P2
PICSIT PDMs periodic switch on (IBIS-016) - ~15min
Spare time
40000 Km crossing descending
Check reactions of instruments to BCP Rad Belt Entry Time
Spare Time
LOS TC Redu (LOS TM at 11:00:00)
Spare Time
F.C.
F.C.
F.C.
F.C.
F.C.
R.S.
R.S.
P-R
P-R
P-R
P-R
P-R
P
P
2002-10-25 12:35:00
0:15:00
P2 + 66:25:46
LOS Checks
R.S.
P
2002-10-25 12:50:00
2002-10-25 12:50:00
2002-10-25 12:55:33
0:00:00
0:05:33
0:00:00
P2 + 66:40:46
P2 + 66:40:46
P2 + 66:46:19
LOS (Perth)
R.S.
R.S.
R.S.
J.Pineiro / F.Cordero
+
+
+
+
+
+
+
+
+
+
+
+
+
58:25:46
58:40:46
58:45:46
59:15:46
59:15:46
59:45:46
62:57:46
63:12:46
63:58:06
63:58:06
64:03:06
64:25:46
64:25:46
Perigee passage, end of revolution 3
REV#3
FD to produce the relevant TPF
FD to process the IMU/RMU TM and
calculate the drift
FD to produce the relevant RWB TPF
FCP_AOC_0054: Configure IMUs 1&4 for LEOP
FCP_AOC_0055: Momentum Biasing (LEOP)
FCP_AOC_0051: Offset Slew (LEOP)
FCP_AOC_0550: RMU Null Bias Calibration
FD to process the data
FD to process the data
FD to produce the relevant TPF's
FCP_AOC_0054: Configure IMUs 1&4 for LEOP
FCP_AOC_0015: FDE CONFIGURATION FOR
POPP
P
IBIS team to check PDM health
EEORTM01 SPI S/A STATUS TM REFRESH
FCP_SYS_1110 LOS_CHK operations (skip time
verification reports)
Page 10 of 10