Download REV #2
Transcript
ACTIVITY UT DURATION TIME FROM PERIGEE EVENT/ACTIVITY TEAM GS 2002-10-25 01:40:00 0:01:00 P2 + 55:30:46 Reset RMU integrator and start the RMU calibration. F.D.M. G 2002-10-25 01:41:00 0:43:00 P2 + 55:31:46 Spare - Night Time F.D.M. G FD/PG FD to process the RMU TM and calculate the drift FCP Reference / Notes PST BCP Pnt Nr Timeline revs 1-6 issue 3 ver 2 FCP_AOC_0550: RMU Null Bias Calibration At the end of this activity, JEMX1 is left in Data Taking for min 24hr, before proceeding with JEMX2. Inform JEMX PI of any attitude change during this period 2002-10-25 02:24:00 2002-10-25 02:24:00 2002-10-25 02:29:00 0:00:00 0:05:00 0:41:00 P2 + 56:14:46 P2 + 56:14:46 P2 + 56:19:46 J.Pineiro on shift [~7hr] Uplink RMU drift correction. Spare - Night Time J.P. J.P. J.P. G G G 2002-10-25 03:10:00 0:15:00 P2 + 57:00:46 IMU -1 and IMU-4 power on for warm-up, IMU selection in ACC and FDE. J.P. G 2002-10-25 03:25:00 0:30:00 P2 + 57:15:46 Spare - IMU Warming-up time. J.P. G 2002-10-25 03:55:00 0:40:00 P2 + 57:45:46 RWB. J.P. G 2002-10-25 2002-10-25 2002-10-25 2002-10-25 2002-10-25 2002-10-25 04:35:00 04:50:00 04:55:00 05:25:00 05:25:00 05:55:00 0:15:00 0:05:00 0:30:00 0:00:00 0:30:00 0:30:00 P2 P2 P2 P2 P2 P2 H/O Goldstone to Perth. Start of IMU + RMU calibration Spare Time (data collection). LOS Goldstone. Spare Time (data collection). J.P. J.P. J.P. J.P. J.P. P-G P P P P 2002-10-25 06:25:00 0:25:00 P2 + 60:15:46 Uplink of the drift correction (IMU + RMU) J.P. P 2002-10-25 06:50:00 0:30:00 P2 + 60:40:46 FDE configuration for the PP. J.P. P 2002-10-25 07:20:00 2002-10-25 08:00:00 2002-10-25 08:25:00 0:40:00 0:25:00 0:42:00 P2 + 61:10:46 P2 + 61:50:46 P2 + 62:15:46 Spare time Start of AOCS PP. The PP period is 10 hours. Spare time P P P 2002-10-25 09:07:00 0:00:00 P2 + 62:57:46 R.Southworth, F.Cordero on shift [~7.5hr] J.P. J.P. J.P. F.C. R.S. 2002-10-25 09:07:00 0:00:00 P2 + 62:57:46 AOS TM Redu. This a a short, low elevation pass (6 degrees maximum). It is only scheduled in order to give some "contingency" window in case of a Perth failure. The exact times are: > 09:07:25 AOS TM > 09:40:08 AOS TC R.S. P-(R TM) 2002-10-25 2002-10-25 2002-10-25 2002-10-25 2002-10-25 2002-10-25 2002-10-25 09:07:00 09:22:00 10:07:20 10:07:20 10:12:20 10:35:00 10:35:00 0:15:00 0:45:20 0:00:00 0:05:00 0:22:40 0:00:00 2:00:00 P2 P2 P2 P2 P2 P2 P2 PICSIT PDMs periodic switch on (IBIS-016) - ~15min Spare time 40000 Km crossing descending Check reactions of instruments to BCP Rad Belt Entry Time Spare Time LOS TC Redu (LOS TM at 11:00:00) Spare Time F.C. F.C. F.C. F.C. F.C. R.S. R.S. P-R P-R P-R P-R P-R P P 2002-10-25 12:35:00 0:15:00 P2 + 66:25:46 LOS Checks R.S. P 2002-10-25 12:50:00 2002-10-25 12:50:00 2002-10-25 12:55:33 0:00:00 0:05:33 0:00:00 P2 + 66:40:46 P2 + 66:40:46 P2 + 66:46:19 LOS (Perth) R.S. R.S. R.S. J.Pineiro / F.Cordero + + + + + + + + + + + + + 58:25:46 58:40:46 58:45:46 59:15:46 59:15:46 59:45:46 62:57:46 63:12:46 63:58:06 63:58:06 64:03:06 64:25:46 64:25:46 Perigee passage, end of revolution 3 REV#3 FD to produce the relevant TPF FD to process the IMU/RMU TM and calculate the drift FD to produce the relevant RWB TPF FCP_AOC_0054: Configure IMUs 1&4 for LEOP FCP_AOC_0055: Momentum Biasing (LEOP) FCP_AOC_0051: Offset Slew (LEOP) FCP_AOC_0550: RMU Null Bias Calibration FD to process the data FD to process the data FD to produce the relevant TPF's FCP_AOC_0054: Configure IMUs 1&4 for LEOP FCP_AOC_0015: FDE CONFIGURATION FOR POPP P IBIS team to check PDM health EEORTM01 SPI S/A STATUS TM REFRESH FCP_SYS_1110 LOS_CHK operations (skip time verification reports) Page 10 of 10