Download "user manual"
Transcript
54 Installation/Mounting the Dish 1 3/4" DEPTH (MINIMUM) BRICK J Figure 37, Drilling Holes for Wall Anchors 7. Horizontally level the mast with a bubble level or plumb line. To horizontally level the mast, place the level, or plumb line, on the mast at an perpendicular angle to the wall. If you are using a bubble level, move the bottom of the mounting foot to center the bubble in the window of the level. If you are using a plumb line, move the lower part of the foot until the plumb line aligns parallel to the side of the mast. With a pencil, draw line from the center line of the lower foot onto the wall. For a details on this procedure, see the leveling the dish section of this manual. 8. Align the center mark of the mounting foot with the line drawn in the horizontal level procedure, With a pencil, mark the remaining three outside holes. 9. Remove the mounting foot. Then, drill three 1/2" holes at the locations just marked. These holes should be at least 1-3/4" deep (The depth of this hole depends on the length of the machine screws). 10. With a brush or air, clean the dust from the holes.