Download 480A 英文说明书 - the BGA Store

Transcript
BGA Hot Air BGA Rework Station
(Model No: KID-R480A)
USER
MANUAL
V1.0
Official Supplier of W-kidi
the BGA store Ltd
WEB: www.thebgastore.com
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Email:[email protected]
Directory
Ⅰ. Instructions on Installation and Operating precautions ............... 3
Ⅱ. Introduction of Rework Station KID-R480A ............................. 5
Ⅲ. BGA Operating Procedures ............................................. 7
⒈ Bakeout: ......................................................... 7
⒉ Clamping board: .................................................. 8
3. Remove/Desolder: ................................................ 10
⒋ Clean Land: ..................................................... 11
5. BGA Reball: ...................................................... 12
6. BGA reball soldering: ........................................... 14
7. Apply solder flux: .............................................. 15
8. Mounting: ....................................................... 15
9. Solder: ......................................................... 15
Ⅳ.Introduction of Touch Screen Control ................................. 17
Ⅵ. Alarm Malfunction and Solutions ..................................... 26
Ⅶ. Maintenance ........................................................ 27
Ⅷ. KID-R480A Technical Parameters ...................................... 28
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Ⅰ. Instructions on Installation and Operating precautions
Assembling Site
To ensure security and avoid possible damages, the Rework Station should be located
where it complies with following conditions:
◆ Away from inflammables.
◆ Free from splashing of water or other liquids.
◆ Free from the direct airflow impact from air conditioner, heater or ventilator.
◆ With good ventilation, dry and free from excessive dust.
◆ Stable and flat location that is free from vibration and shock.
Power Supply
Power and voltage should meet the below requirements.
◆ Use the power supply with little voltage fluctuation
Voltage fluctuation:
Frequency fluctuation:
AC220V±10%。
50/60Hz±0.3%。
Space requirements:
To facilitate operation and maintenance when we have to move the machine
forward/backward and turn it, it is required to reserve a room that is >300mm far from
the back.
Operation Precautions:
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
While operating the rework station, pls follow the following precautions:
1. After switching on the power supply, firstly check if there is airflow blowing from the
upper/lower hot air nozzle. If not, it is prohibited to start heating. Otherwise the
heater will get burnt.
2. Set different profiles for various BGA. The maximum temperature setting of any
segment of the profile shall be less than 300℃. Refer to the BGA tin bead welding
profile while using the lead-free rework.
3. Check the PCB land and BGA tin bead one by one before mounting BGA. After
mounting, check the appearance one by one. If any abnormal symptom occurs, stop
mounting and check the temperature immediately. The soldering can be continuously
performed only after the proper adjusting. Otherwise it may damage the BGA or PCB
plate.
4. Regularly clean the surface of the machine. In particular, keep the IR heating board
surface clean. Prevent the dirt drops on it. The dirt may affect the proper heat
radiation and result in poor welding quality as well as considerably reduce the
lifetime of the IR heater.
5. Untrained operator can’t change any set parameters.
6. Avoid electric fans or other equipments blowing toward to the rework station while it
is working, or it may cause the heater’s abnormal temperature rise, and the work
piece will get burnt.
7. While it is working, don’t put any stuff on the heating area. Otherwise the stuff will
get burnt. The PCB should be put on the supporting frame.
8. It is prohibited to touch the heating area to avoid burn while working.
9. While working, keep the rework station away from the flammable sprays, liquid or
gas.
10. Don’t remove the front panel or cover of the electric cabinet that is with HV (high
voltage) components in that may cause electric shock.
11. In case the metal or liquid falls into the station while it’s working. Shut off power and
pull out the plug. Clean away all the dirt after the machine cools down. It will give
out bad smell if there is dirt when it restarts.
Note: Never clean the IR heater (heating board) with liquid. Use fine sand paper
to rub away the stubborn dirt on the IR heating board. We will be irresponsible for
replacing the heater for free for the previous mentioned reason.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Ⅱ. Introduction of Rework Station KID-R480A
BGA Rework Station KID-R480A made by W-KIDI has 3 heaters (Upper Heater, Lower
Heater and Bottom IR Heater). The upper and lower heaters heat directly towards BGA part
to ensure BGA gets enough heat to reach the melting point to come to good welding quality.
The bottom heating zone is large area IR heating board for preheating the whole PCB board
to insure even heating and prevent the PCB get deformed.
KID-R480A Diagram:
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Parts name:
1、Knob for fine-adjusting the height of the upper heater
2、Knob for locking the upper heater from moving forward/backward
3、Handle for locking upper heater from rotating
4、Knob for adjusting upper heater up/down
5、Upper heater
6、Upper nozzle
7、Lower nozzle
8、Lower heater
9、Knob for adjusting the lower heater up/down
10、Vacuum pen
11、USB port
12、Temperature sensor joint
13、Touch screen
14、Knob for locking PCB jig
15、Knob for positioning PCB
16、LED lamp
17、PCB supporting bar
18、PCB clamping device
19、Bottom IR heating board
20、Cooling fan
21、Power switch
22、Lamp on/off
23、Laser light on/off
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Ⅲ. BGA Operating Procedures
BGA rework on PCB should comply with the following procedures:
⒈ Bakeout:
Both PCB and BGA must be baked in a constant temperature oven at a temperature range
from 80℃~100℃ for 8h~20h. The purpose of baking is to dehumidify the PCB and
BGA in case blowout during rework.
Table 1 Moisture sensibility grade:
Grade
1
Time
Context Saving
(RH: relative humidity)
≤30℃/85% RH
Timeless
2
1 year
≤30℃/60% RH
2a
4 weeks
≤30℃/60% RH
3
168hs
≤30℃/60% RH
4
72hs
≤30℃/60% RH
5
48hs
≤30℃/60% RH
5a
24hs
≤30℃/60% RH
6
Refer to the
labeled time
≤30℃/60% RH
Table 2 Baking time:
Seal
thickness
≤1.4MM
≤2.0MM
Humidity
sensitivity
Baking time
grade
2a
4hs
3
7hs
4
9hs
5
10hs
5a
14hs
2a
18hs
3
24hs
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
≤4.0MM
3
31hs
5a
37hs
2a
48hs
3
48hs
3
48hs
3
48hs
5a
48hs
⒉ Clamping board:
1.1. To select proper upper nozzle and lower nozzle suitable for BGA sizes.
1.2. Upper nozzle is fixed on the upper heater head. Tighten the screw to fix the nozzle that
can be adjusted as per BGA position and angle. Lower nozzle is fixed on the lower
heater. Rotate the up/down fine-adjusting knob to lift the nozzle and then tighten the
screw to fix the nozzle.
Diagram:
Screw for fixing upper
Upper
Knob for up/down
adjusting lower
Lower
Screw for
fixing lower
nozzle
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
2. 3.Adjust upper and lower nozzle positions; rotate the knob to lower the upper heater; by
moving upper heater backward/forward, make the centre of upper nozzle and lower
nozzle align. After adjusting, lock the forward/backward handle and fix the heater not
moving forward/backward. Then lift the upper heater. If need to rotate upper heater,
loosen the upper heater rotate lock. If not, tighten it.
Diagram:
Adjust the position of
Knob for locking the upper heater from moving
forward/backward
Knob adjusting
upper heater
Knob for
locking
2.4.Adjust PCB clamping device and PCB support bar, close up the clamping device and
support bar both sizes before putting PCB on it, then lift the PCB support pillar( which
can be adjusted to a proper position according to PCB size) and make it be in line with
the stage of the PCB clamping device( which prevents the PCB from getting deformed).
As shown in the following picture:
PCB support
pillar
Hole for
putting
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
PCB clamping
device
2.5. Put PCB onto the support bar, then align BGA chip with the upper and lower nozzles,
make their cores in one line. Adjust PCB clamping device till the board is in the stage of
the clamp device. As shown in the following diagram:
2.6 Lower the upper heater head, adjust PCB forward & backward, make sure the upper
nozzle can cover the whole BGA chip, then lock the positioning mechanism for
clamping. Meanwhile adjust PCB clamping device left & right, make sure the whole
BGA chip is covered by upper nozzle completely, finally lock the positioning
mechanism for clamping.
As shown in the following diagram:
PCB
positioning
mechanism for
clamping
PCB put on the
stage of
clamping
Knob for lock
clamping
Conclusion:A qualified board clamping should be as follows:
The whole PCB must be inside of the bottom area IR heater, so that is can be
heated evenly. The upper nozzle must properly cover the BGA, so that the chip
can be heated evenly. Besides, the cores of BGA chip, upper and lower nozzle
must be in one line. Observe bottom of PCB to make sure the supporting pillar
and bottom nozzle can support the surface of the PCB. The upper nozzle heating
position (lowest position) is 1mm away from the BGA surface.
3. Remove/Desolder:
3.1 Clip PCB to the board supports, clamp and fix the PCB as what we introduced as above.
3.2 Select or set a suitable profile, click “Desolder” on the touch screen, the system will
perform desolder process. When heating completes, it will alarm. Meanwhile the
vacuum is ready( it will buzz when the pen starts vacuum). Rotate the knob to lift the
upper heater head, then immediately plug the hole of the vacuum pen with the thumb and
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
take the red tip of the pen close to the surface of BGA to pick it up from the PCB.
Release the vacuum pen, the BGA will come down from the pen. Then the cooling fan
starts work. Cooling finishes. Take the PCB out from the supports.
Cover the
hole with
Vacuum
pen’s
Pick up the BGA
after
desoldering
⒋ Clean Land:
The PCB land and BGA land must be cleaned in a short time after desoldering. Because
the damage to the land is small while the PCB or BGA haven’t cooled down completely.
Please refer to the following steps. (Cleaning PCB is the same) As shown as following
diagram.
4.1 Prepare a soldering iron with temperature 370℃ ( for lead-free chip) and 320℃ (for
leaded chip)
4.2 Apply a little layer solder flux to BGA equally
4.3 Mop the chip with the soldering iron to clean it.
4.4 Take a wick to clean the land until it is neat.
4.5 Wipe pad: To ensure the reliability of BGA soldering, wipe the pad with some volatile
solvent, such as industrial alcohol.
Apply solder
flux with
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Mop the pad with
soldering iron
Mop with both iron and
Wipe pad
5. BGA Reball:
5.1 Choose a stencil, a reballing kit and proper solder ball that match the BGA, put the stencil
between the kit’s frame and cover, then screw up to lock the stencil. ( But please do not
lock it tight, so that it can be fine-adjusted and moved)
Stencil
Scre
Spare ball
Kit’s
5.2 Apply solder flux to BGA equally, then place BGA as the picture showing below; adjust
the locating block to make BGA’s diagonal and the reball kit’s diagonal match together,
only in this case the BGA is located in the center of the reball kit; finally lock the four
locating block it fix it.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Locating
Apply solder flux
Screw adjusting the gap
between BGA and stencil
Lower die
holder
Reball kit’s
diagonal
5.3 Put the cover with stencil inside over the kit; then move the stencil lightly to make its
holes match the BGA pins. In case this method is not good enough to make stencil’s
holes and BGA pins match each other, (pay attention to the deviation place) remove the
cover(frame), release the screw, readjust BGA and repeat all those actions only to make
sure the stencil’s holes match the BGA pins; finally lock; otherwise, you have to
fine-adjust the stencil.
Final
Adjust stencil
to
make its holes
match the BGA
pins
5.4 Adjust the gap between BGA and stencil.
By adjusting the Screw to make the gap between BGA and the stencil 2/3~3/4 of the
ball diameter. Make sure one hole for one ball going through only and it is convenient to
take out the stencil.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
5.5 First, exam if the solder ball size matches the chip and stencil; second put it on the stencil
as the following picture shows, then shake the whole kit lightly to let the ball drop to the
BGA land through the stencil’s holes. Finally check whether every pin has been reballed
( make sure no pin missing), then we can put the spare balls aside and take out the
cover.(note that tilt the kit while taking out the cover in case that the reballed balls go out
from the holes of the stencil. After that, the qualifiedly-reballed BGA can be taken out.
( At this time if some pins found missing( not yet reballed, we can make it up by a right
tweezers. ) After reballing completely, recollect the spare balls.
5.6 When change for other BGA chip of different size as well as solder ball, please repeat
steps 1-4
Put solder ball on
Tilt the kit
Put the spare balls
6. BGA reball soldering:
6.1 Put the BGA with the balls on the heating area, and then solder the balls on the BGA land.
Setting the soldering temp.(230℃ for leaded, 250℃ for lead-free).
6.2 After setting temperature, start the soldering station and wait for the temperature going up
to the required value and keep constant temp..
6.3 When constant temp., put the reballed BGA onto the soldering station with a
high-temperature paper underlaid to heat, meanwhile use a hot air gun as a assistant
heating from the upper surface.
6.4 When the balls are melted, they become shining liquid and line up. Then move the BGA
to cooling station to cool down. Soldering finishes.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Soldering heating
High temp.
BGA balls are melted
7. Apply solder flux:
7.1 To guarantee soldering quality, make sure that the PCB land is free of dust before
applying solder flux. The best way is to wipe the land before applying solder flux every
time.
7.2 Apply a layer of soldering flux on the PCB solder land with a brush pen. Excessive flux
may result in the balls shorted, in reverse, it easily causes missing solder. So the
soldering flux coating shall be even with a proper amount so as to remove the dust and
foreign materials from the BGA balls and improve the welding effect. ( Applying solder
flux to BGA is the same)
8. Mounting:
Fix the PCB on the station. Mount the reballed BGA on the PCB in right position. When
positioning, align BGA land with PCB land by referring to the silk-screen frame. Note
that the direction sign on BGA should be corresponding with the one on PCB.
9. Solder:
9.1 Clip the PCB with renewed BGA placed to the supports, exam the alignment of BGA and
PCB, adjust the supports .
9.2 Set or choose an appropriate profile according to the PCB type, press “Solder” button on
touch screen, it will perform soldering process. When finish, it buzzes to alarm,
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
meanwhile cooling starts as well.(The cooling time can be set in the profile) Then lift
upper heater and put it aside. When cooling completes, take PCB out of the machine.
Notes:The difference between Solder and Desolder process is the way of cooling, i.e.
cooling starts right after soldering completes, but cooling starts 8 seconds (time is
settable) after desoldering/removing process completes.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Ⅳ.Introduction of Touch Screen Control
1:Main Menu
Picture-1
l
Peak Temp.: display the highest temperature the 1st thermocouple detected
during heating process; clear away the latest record value when restart heating;
l
Vacuum: vacuum start switch; click it---vacuum on (button color becomes brown);
Reset it— vacuum off (button color becomes white)
l
Cool: start or stop cooling fan by hand (Remarks: forbid starting it during the
heating, and stopping it during the cooling time)
l
Hold: hold the current segment temperature during the heating process;
l
Solder: click it and soldering action starts with the temperature profile currently
selected.
l
Desolder: click it and desoldering action starts with the temperature profile
currently selected.
l
Segldx: the current segment No. the upper temperature profile runs to;
l
Upper: the actual temperature of upper heater
l
Lower: the actual temperature of lower heater
l
Bottom: the actual temperature of bottom IR panels
l
1st TC: display the actual temperature of thermocouple-1 on the port.
l
2nd TC: display the actual temperature of thermocouple-2 (can expand to two way
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
thermocouple ports)
l
Remaining time: the remaining time for the upper heater in the current stage;
l
Heating time: the total heating time;
l
Remaining cool time: cooling time countdown when the cooling fan starts; the
cooling fan stops when counting down to ”0”;
l
Reflow time: to analyze the time when the 1st thermocouple temperature exceeds
solder ball melting point; during the reflow, the temperature rises from ball melting
point to the peak temp. and then drop from the peak temp. to the melting point;
l
Main menu: as show as picture-1
l
Advanced menu: to manage, set and display the temperature profile parameters;
l
Assist menu: to include auto profile, PCB bake and BGA reballing operations;
2:Advanced menu
Picture-2
l
Profile No.: the current profile number; Number range:1~49
l
Save: to save the current values to the database of background system
permanently;
l
Segment No.:
l
Upper(℃):the set temperature in each segment for the upper part;
l
Time(S):the constant temperature time in each segment;
l
Lower(℃):the set temperature in each segment for the lower part;
S1~S8, the temperature profile segment number;
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
l
Time(S): the constant temperature time in each segment;
l
Bottom Temp.:the set temperature for the bottom IR panels;
l
Reflow Temp.:
to analyze the 1st thermocouple over the melting point
temperature time of soldering ball
l
Alarm Temp.:the high temperature alarm when system reaches this alarm
temperature value;
l
Cool time: the running time of the cooling fan after heating finishes.
l
Upper air speed:control the air speed for the upper heater ( input range:1-3; 1, 2,
3 is corresponding to low speed, intermediate speed, high speed)
l
Lower air speed:control the air speed for the lower heater (input range:1-3; 1, 2, 3
is corresponding to low speed, intermediate speed, high speed)
l
Nozzle Size: the corresponding nozzle size for the current profile used.
3:Assist Menu
Picture-3
Auto-generate Profile:
l
Standard mode:suitable for most of common PCB boards and BGA without
special requirements; in this mode, lower temperature is a little higher than upper
temperature.
l
High Temp.-Top:Mainly for BGA with heat sink itself and good heat-resistance or
some BGAs under which there are some heat reactive components. In this mode,
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
upper temperature is higher than lower temperature. Desoldering and soldering
mainly depends on the upper heating, and lower heating is as an adjunctive one.
l
High Temp.-Bottom:mainly for Crystal-bare BGA and double-layer BGA. In this
mode, lower temperature is higher than upper temperature. Desoldering and
soldering mainly depends on lower heating, and upper heating is as adjunctive
one。
l
Special mode:Mainly designed for desoldering of glued boards and some boards
with requirements for low peak temperature.
l
leaded / leadfree:to integrate the process change for leaded and leadfree profiles
internally;
l
Auto calculate : to click it to perform desoldering; while heating, system
auto-calculates and changes target profiles.
PCB Bake
l
Setting Temp.:the set temperature for bottom IR
l
Actual Temp.:the actual temperature of bottom IR in current
l
Output limit:the Max output power of bottom IR, input range: 0~32000, 32000
corresponds to 100% power;
l
Setting time: to set the bake time; system will stop heating automatically when
time is up;
l
Remaining time::the time countdown of the whole baking process
l
Run:start
button for baking
BGA Reballing
l
Setting Temp.:the set temperature for lower heater
l
Actual Temp.:the actual temperature of lower heater
l
Air speed::input range 1~4
l
Setting time: the required heating time for the reballing
l
Remaining time: the countdown of reballing
l
Run:start button for reballing
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
★ Maintenance skill
1. When we are not sure if the BGA is lead-free or leaded, for safety, we had better
treat the BGA as leaded. Enter the leaded temp. profile, insert the wire sensor
into BGA, start desoldering on the touch screen. Check if the BGA melted with
nipper when the measured temp. up to 190℃. It is leaded BGA if the ball melt. It
is lead-free BGA if the ball melt when 217℃.
2. Select proper profile based on BGA size and PCB thickness, We need to
increase the bottom temp. if the PCB is too thick.
3. For usual computer board, the temp. setting are similar. The temp. for north
bridge is several degrees higher than south bridge. In case the notebook PCB,
the lower temp. setting is high with the upper temp. at 210-220℃ for the display
card. If the upper temp. setting is high, the balls on video memory will melt that
will result in failed soldering.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
V.
Creating a Profile
To set BGA temp.
requirements.
profile, insert the wire sensor into BGA to check if the profiles meet the
Our company provide with lead-free and leaded profile for reference.
Entry
parameter setting screen, set the profile parameters as per various BGA types as following.
Leadfree profile setting (Fig. 1)
During the whole heating process, there are 8 stages from preheating to cooling, but
usually only 5 stages are enough and available
1. PRE. , Stage 1: preheating the board; in this stage, temperature is low, usually below
100℃;
2. RISE, Stage 2, temperature rising; in this stage, we want temperature rise quickly, so we
usually set 205℃ for lead-free and 190℃ for leaded.
3. Cons. , Stage 3, keeping temperature constant, in this stage, we keep a constant
temperature of 20-30℃ lower than stage 2 so as to wipe off the impurity on the board,
because during this period the flux is volatilizing which does good for wiping off the
impurity.
4. REF. , Stage 4, ball melting and reflowing; in this stage, the ball begins to melt and
reaches to the peak, so the temperature should be high( usually is highest) and time should
be long.
5. REF. , Stage 5, reflowing( from the peak to ball’s melting point); in this stage,
temperature must be lower than Stage 4, and time usually is 5~10S in upper heater.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Insert the wire sensor into the
BGA to test the temp. of balls
Testing temperature (Fig. 2)
6.
Check the PCB to be repaired, and confirm it is leaded or leadfree.
E.g.
PCB is
leadfree (of course BGA also leadfree): First of all, we choose a leadfree profile and
check the settings (as in shown Fig. 1). Second, clamp the PCB to the supports and insert
wire sensor into BGA (for testing temperature). Third, start “desoldering” (as in shown
Fig. 2).
When heating completes, look over the ‘Analyze’ column to check the
preheat time, reflow time and max. temperature (peak) whether they meet the
requirement of leadfree technology. (as in shown Fig. 1)
7. If every parameter in Fig. 1 meets requirement, that means this profile is suitable for this
BGA, then we can save it as “LF+ (BGA model number).
Next time we repair the same
BGA chip as this, no need to test the profile any more, but use it directly. In reverse, we
havetochangesettingsthensave.
8. If the max temperature/peak (TC) is lower or higher than the standard required
temperature 245 ( leadfree), we can take ℃ a method as follows:
e. g.
The tested Max temperature is 220℃, (245-220)×1. 2=30
e. g.
The tested Max temperature is 260℃, (245-260)×1. 2= -18
We put “30” or “-18” to “offset”, then we can get a suitable profile.
9. If the preheat time is too short which doesn’t meet requirement (60~90s leadfree), there
are two solutions to make a suitable profile:
9. 1. When the profile running finishes stage 2 with a temperature (TC) below 150℃, we
can increase the set temperature or prolong the time in this stage on both upper and
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
lower parts.
The standard requirement is that TC/ wire sensed temperature must up to
150℃ when stage 2 ends.
9. 2 The profile running finishes stage 2 with a temperature (TC) of 150℃ or more.
this case, we should prolong the time in stage 3.
number missing in preheat time.
i. e.
In
The prolonged time must be the
We prolong how much seconds it misses in
the preheat time ( preheat time must be between 60~90s).
10. If reflow time is too short below (40~90s) which also does not meet requirement,
10. 1
The solution is to prolong time in stage 4 or 5.
The same as point 9. 2. i. e. to
prolong how much seconds it misses in the reflow time( reflow time must be between
40~90s)
10. 2
Suppose the preheat time and reflow time are too long (preheat time over 60~90s,
reflow time over 40~90s), we can take a reverse method of the above.
10. 3
After changing the setting, we get a new profile.
Also we have to test this new
profile again. The method of testing is the same as what we mentioned in Fig. 2.
Even this profile is still not qualified, we have to change and readjust setting again
and again until it is qualified, then save in the machine.
Leaded profile setting
The method worked on leaded BGA chip is the same as lead-free one.
★ Rework
Skills
1、If we are not sure the BGA is leaded or leadfree, for safety concerns, we take a leaded
profile to test (To test means to desolder a BGA with the wire sensing inserted).
During
heating, when “TC” on the touch screen goes to 190℃, flip the BGA with a tweezers.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Here, if the balls are already melted, we can say it is leaded.
In reverse, we can say it is
leadfree. Only when “TC” goes to 217℃ can the BGA balls be melted, we might
know it is leadfree.
2、Usually we select or make an appropriate profile according to the size of BGA and the
thickness of PCB.
The thicker PCB is, the more temperature in lower part we need to
increase.
3、Profile setting for South Bridge and North Bridge is almost the same.
But exactly
NB(North Bridge) needs a little more temperature than SB(South Bridge). (usually a few
degrees only) For the two-store VGA on laptop motherboard, we need to increase
temperature in lower part and decrease temperature in upper part a bit( in stage 4 of upper
part, set 210-220℃).
The reason why we do so is that high temperature in upper part
will damage the small chips on the VGA.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Ⅵ. Alarm Malfunction and Solutions
1. Upper part heating abnormal!
1.1. Reason:
a. After starts heating, with the power consumption of more than 99%, if the
practically-sensed temperature is below 150℃, the upper heater should heat up at a
speed of more than twice of the it’s normal.
b. If the practically-sensed temperature is over 150℃, the upper heater should heat up at
the speed of 0.1℃/S.
c. If any of the above two situations can not be qualified, the system will give alarm.
1.2. Troubleshooting:
a. make sure the temperature parameter setting is correct
b. check whether the blast blower, upper heating coil and upper temperature-sensing wire is
working.
2. Lower part heating abnormal!
2.1. Reason:After starts heating, with the power consumption of more than 99%, if the
practically-sensed temperature is below 150℃, the lower heater should heat up at a speed of
more than twice of the it’s normal speed. If it can not reach that temperature standard
continuously for 5s, the system will give alarm.
2.2. Troubleshooting:
a. make sure the temperature parameter setting is correct
b.check whether the blast blower, lower heating coil and lower temperature-sensing wire is
working.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Ⅶ.
Maintenance
In order to guarantee the machine function and prolong service life of the machine,
during usage, we have to do some maintenance on the system regularly as follows:
Components name
Maintenance method
Maintenance period
Open the cover, clean the
Upper heater
Up& Down Drive
mechanism on upper heater
fan with high-pressure air
1 month
Apply some butter on lead
rail, rack, gear and other
1 month
drive mechanism
Open the front cover of the
machine, use vacuum
Electronic box
cleaner to suck the dust and
3 months
dirt, and check whether the
components fixed well
Forward& Backward
Driver on upper heater
Rotating part of upper
heater
Apply some butter on lead
rail, rack, gear and other
1 month
drive mechanism
Apply some butter on lead
rail, rack, gear and other
1 month
drive mechanism
Clean the heating tube with
Bottom IR heating panel
dry cloth(do not use wet
1 day
one)
Apply some lubricant to
PCB clamps
the PCB supports and shaft
of support guiding axle
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
1 month
Ⅷ. KID-R480A Technical Parameters
Technical Parameters
Applicable PCB
Applicable BGA
Temp. Control
PCB size
460mmX370mm
Workable area
460X370mm
Max. PCB thickness
3mm
Max. size
60mmX60mm
Min. size
2mmX2mm
Max. weight
80g
Top heater
350℃
Lower heater
350℃
Sub(bottom) heater
300℃
16sections of
Temperature control
programmable
temperature control setting
Power for operation
3800W
Main heater
600W
Lower heater
800W
bottom heater
2400W
Dimension(LxWxH)
620*600*650mm
Weight
40KG
Power consumption
System Parameters
Input voltage
Power
for requirement
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
AC 220V
4KW
Shenzhen W-KIDI Technology CO., LTD.
@ the BGA store Ltd
Pls kindly understand we will not keep you informed if there are some
revised parameters due to we have been developing and improving the
technology always.
Shenzhen W-KIDI Technology Co., Ltd
Worldwide
reseller
Website:www.thebgastore.com
@ [email protected]
:
Hot line: 00441633675768
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn