Download - Service, Support

Transcript
Configuration Guide
6.25.13
Transfer to Route Control Project Engineering
A large portion of the project engineering data created in the S7 project can be
reused for the Route Control project.
For a detailed list of all data that can be transferred and a description of how to
transfer data using the Route Control Wizard, refer to Route Control Wizard:
Actions
6-100
Process Control System PCS 7 - SIMATIC Route Control
A5E00343836-02