PV4E User Manual – V6.0
rule overcomes this problem by allocating the least popular outlet (In this
case Outlet c) before every other outlet.
Operation Generation Rules
The operation generation rules generate a list of tasks for each request based
on the relevant information. For example, if a workstation and printer are
selected for move, the rules for workstation and printer are executed.
The output of this process is a Work Order containing operations that contain
tasks. You can sort the Work Order tasks according to one of their properties
(e.g. type, assignee, etc.). The Work Order production is ruled by the
defined policies in the system.
User Defined Rules
In addition to the out-of-the-box rules, the automated Provisioning module
has a highly flexible engine which allows adding user defined rules to the
system without a need of rebuilding the application. For additional
information contact a RiT representative.
Work Orders and Tasks
The output of a provisioning request is a work order. A work order is a set of
tasks that have to be carried out in order to implement
Move\Add\Change\Swap\Remove activity to one or more terminal
equipments. The tasks are divided into two major categories:
1. Online tasks – Tasks which can be automatically monitored by RiT’s smart
cabling. These tasks are the Break Link and Link tasks.
2. Offline tasks – Tasks which can not be automatically monitored for their
completion. You have control over the offline tasks and can set new tasks
without the need for R&D intervention.
Provisioning module – General orientation
This section gives an overview of the provisioning module major screen and
views.
Location Tab
The Location tab in the Work Order screen is where the inventory is viewed
and the different provisioning requests are generated.
The buttons on the toolbar are grey for inactive, orange for active.
RiT Technologies Ltd.
306