Download TOC-VCPH/CPN & TOC-Control V Software
Transcript
4.3 Measurement Procedures and Tutorial 4.3.3 Ending Measurement Auto Restart The Auto Restart function is used to shut down the instrument and then restart it at a specified time. Selections are made for the date and time that measurement will next be performed, as well as for the instrument restart settings. After shutting down the instrument, the carrier gas flow and power to the furnace are automatically turned off. Approximately one hour before the restart time, the furnace and the carrier gas will automatically be turned on to allow the instrument to achieve a Ready state by the restart time. 1. 2. 3. Select Auto Restart in the Standby window. Select the appropriate instrument restart settings (TC furnace, carrier gas, ozone generator) and set the restart date and time. If a check is placed in the box beside a unit, the furnace power remains on and the carrier gas continues to flow. In order to have the power turned off automatically, do not place a check mark in any of these boxes. Click the Standby button. Power to the instrument is automatically switched off and will be automatically switched on approximately one hour before the restart date and time. Using Auto Restart, measurement can be performed immediately at the specified startup time. Reference: Refer to Section 4.4.6.3 "Standby" for detailed descriptions of the available instrument shutdown options. TOC-VCPH/CPN 121
Related documents
Infotainment Radio Bolero Manual de instrucciones
(M)SDS - 純正化学株式会社 製品検索・MSDS検索
Samsung SGH-M200 Felhasználói kézikönyv
116 紫外線チェッカー・イオンメーター・電磁波チェッカー
Sp - 同仁化学研究所
Motor Driven Gear Pumps - PRO-CONS
化学物質等安全データシート
MiniDos Manual - Greenhouse Megastore
Complete Protocol
TOC Operation Instructions
Arbalou Phyto Relax - La boutique de l`Arbalou
Introduction to the Fusion TOC Analyzer