Download - Worcester Bosch
Transcript
PRE-INSTALLATION Do not operate the appliance if the flue terminal fitted on the outside wall or roof is obstructed or damaged. 170/210mm*** 960mm CONNECTIONS: Heating System: 22mm compression fittings Gas: 22mm compression fittings PREPLUMBING With the plumbing manifold installed, pipe work can be installed to the valves on the manifold. 600mm** RUNNING PIPES BEHIND THE BOILER If the boiler pipes are to be run behind the appliance ensure that the pipes pass close to the wall as shown in the diagram opposite, and within the pipe guide. 5mm 5mm 200mm 380mm 450mm * ** *** PLUMBING MANIFOLD Use the fittings supplied in the Hardware pack. 6720803599-10.1Wo 1130/1170mm*** 20mm* 3.7 Flow 22mm Return 22mm Minimum clearance to removable door Minimum clearance required for servicing Height for either 60/100 or 80/125 flue Table 6 Minimum clearances BATHROOMS: Additional RCD (Residual Current Device) protection may be required. Refer to the latest IET wiring regulations. NOTICE: Any switch or appliance control using 230 V mains electricity must not be able to be touched by a person using the bath or shower. Electrical switches, fused spur and socket outlets must not be situated in the bathroom. BATHROOM INSTALLATIONS 600m m 600m 600m m 1 2* 2 * 2 2 1 2 2250mm 2250mm 1 m Radius 600mm 6720646608-124.3Wo Mains Gas Supply 22mm 6720806548-03.1Wo Fig. 19 Bathroom installations Fig. 20 Behind the boiler pipe run 14 6 720 815 723 (2015/05)