Abbreviations…………………………………………………………………………v
1.
2.
3.
4.
5.
Introduction………………………………………………………………1
1.1.
Cold rooms and freezer rooms………………………………. 1
1.2.
Equipment descriptions……………………………………… 1
How to buy and maintain cold rooms and freezer rooms………… 2
How to use this document………………………………………………3
Cold Rooms operating at +2°C to +8°C……………………………….4
Freezer rooms operating at -15°C to –25°C…………………………12
Annex 1: CFC-free symbol……………………………………………………20
Annex 2: Location details for cold room or freezer room………………….21
Annex 3: Installation and commissioning/acceptance test protocol……..22
(note see PQS E01-CR-FR-VPN2 presently a separate draft to be
included with this document in future publications)