Download Maintenance procedure
Transcript
s Maintenance programme Masterpact NT/NW Level III Issued by: ABT Services Product Manager Validated by: ABT Quality Manager Last modification Index A First edition (See last page for details on modifications) 15 December 2004 Date Warning: For checks and preventive maintenance, the operator must take all necessary precautions to avoid injury. Circuit-breaker test: Unless specified otherwise in the special indications below, all operations (inspection, test and preventive maintenance) must be carried out with the circuit breaker (device and chassis) and the auxiliary circuits de-energised. Checks to ensure that the circuit breaker is de-energised must be carried out on the upstream and downstream terminals. Test equipment: The high voltages used for certain tests are dangerous and may result in serious injury or death. During the tests, it is strictly forbidden for anyone to touch the circuit breaker or the conductors while voltage is applied. Return to operation: Before putting the equipment back into operation, it is mandatory to check that all connections are made with the correct tightening torque, the inside of the cabinet is clean, all protective covers are in position and the circuit breaker is off (open position). Subassembly Control and indication auxiliaries Action Check operation of control auxiliary XF at 0.85 Un Goal Check that XF closes the circuit breaker at 0.85 Un. For a drawout device, check the electrical continuity of the wiring. Frequency Every 2 years Special indications This test requires an external power supply. For voltages greater than 50 V DC, all suitable measures to avoid electrocution must be taken. Pre-test conditions Device The device must comply with the conditions specified opposite. Necessary tools auxiliaries NIII_2_2.doc Fixed Drawout Position of poles Open Open Mechanism Charged Charged Device position in chassis Connect ed Test Discharged Disconne Removed cted Adjustable external power supply 1/3