Working with the Kanban view
The Kanban view displays each step in the Pipeline / Kanban in a horizontal structure based on the dependencies
within the Kanban.
•By dragging each Kanban item forward you complete a step in that Kanban.
•By dragging each Kanban item backward you set a step in that kanban to incomplete.
•By dragging an item to the Kanban completed flag you complete the whole Kanban at once.
1.WIP means 'Work In Progress' and tells you how many items are ongoing in each step. This is a powerful tool
to see where bottlenecks exists within a project.
If cards turn red instead of orange they are overdue, this is decided by Takt time / Max duration for this task which
can be set on each step in the Kanban.