Download Pump Station Operator Training Checklist
Transcript
Station Maintenance Tasks This section requires 30 to 45 minutes for training. This Pump Station, consistent with all machines, requires preventative maintenance to enhance reliability and extend service life. Rain Bird recommends employing our extensive ASP network to perform semiannual service and regular inspections. As a minimum for warranty assurance, the Owner will ensure the procedures outlined in the Preventative Maintenance Schedule are completed including the Powder Coat Touch-Up and Winterization Procedures when necessary. Pump Station maintenance tasks should be accomplished by a trained Authorized Service Provider (ASP) due to inherent danger from high voltage, high pressure and rotating equipment as well as required specialized skills. Contact Rain Bird GSP to schedule service. See the available Rain Bird Preventative Maintenance Plans for extended service. Preventative Maintenance Schedule ASP 1. Review the Preventative Maintenance Schedule outlined in Chapter 5.1 of the User Manual. 2. Explain the importance of not storing equipment and supplies on the skid or piping. 3. Explain the importance of regular visual inspections and keeping the station clean and dry. PRV Adjustment Procedure If a PRV is installed, perform the following training. ASP 1. Review all applicable WARNING, CAUTION and NOTE messages in Chapter 5.2. 2. Discuss the safety role of the PRV and briefly discuss its operation. 3. Show the position of each valve for proper operation. The Operator should be familiar with the function of the PRV and the normal sound it makes when it flushes. Executing the PRV Adjustment Procedure is optional and at the discretion of the Operator. Powder Coating Touch-Up Procedure ASP 1. Locate the procedure in Chapter 5.3 for the Operator to reference. 2. Discuss the importance of timely repairs to any damaged areas of the protective powder coat layer. Failure to perform this procedure when necessary will reduce the life of the Pump Station. Winterization Procedures ASP 1. Refer to Rain Bird’s Pump Station Professional Customer Satisfaction Policy. Discuss the importance of winterizing a station as freeze damage is not covered by the warranty. 2. Locate the procedure in Chapter 5.4 for the Operator to reference. 3. Briefly discuss the concept of removing all water from the entire station especially the Pressure Transducer, Heat Exchanger, PRV and each Pump. Global Service Plan (GSP) Support Instructions ASP – Locate the instructions in Chapter 5.5 for the Operator to reference.