Download ceress

Transcript
Page 120
Test Number
Test type
Test facility
Test item
Test level/
procedure and
duration
Test campaign
duration
Test Number
Test type
Test facility
Test item
Test level/
procedure and
duration
Test campaign
duration
Test Number
Test type
Test facility
Test item
Test level/
procedure and
duration
Test campaign
duration
Test Number
Test type
Test facility
Test item
Test level/
procedure and
duration
Test campaign
duration
5
Vibration Test
DLR Bremen
Entire system
The entire experiment shall be tested under vibrations
that occur during nominal launcher operations.
Tbd
6
Electromechanical interferences
LRT Laboratory
Electrical components
The influence of electrical components on each other
shall be tested
Tbd
7
Functional Test
LRT Laboratory
Whole RM
RM shall recover to the last state in every phase of
countdown and flight when a power drop occurs
2 days
8
Functional Test
LRT Laboratory
Whole RM
Data on SD-Cards has to be readable after a power drop
and no data is overwritten.
2 days