OPERATION MANUAL be carried out using maximum available power. The Customer has the option to limit power during charging cycle if Pr value is set less than maximum charging value of -500 kW. Once the charge cycle is competed (BES SOC=100%), the ABB Control System will stop charging and inhibit inverters waiting for discharge cycle to begin. Time synchronization (TSP) and Actual feeder load Pm are not required in this mode. MODE 2 – REMOTE CONTROL screen is used for overview of the process. Mode 2 Operator Control Screen Document Number ABB Inc. 601887-0A1-M99 Lang. Rev.. E 0 Sheet 42 No. of sh. 56