Download PTS 3.1 C Portable Test System Operation Manual - MTE
Transcript
Reference power mode for energy measurement and energy dosage Active power Reactive power Apparent power Register test switched OFF, the corresponding field is blank in the register test main menu. Maximum demand period Time period for maximum demand test in minutes (e.g. typical value: 15 min). This interval must be manually synchronized with the maximum demand period of the meter under test by starting the test with the interval start at the meter. Hint: The maximum demand test is always running and cannot be switched off. If this is disturbing, a period of 60 min can be entered. In this case WP1(t)/t will indicate the energy counted up since start in Wh during 1h. Error tolerance band Entry of an upper and lower tolerance between ±0.0000... ±100 %. Enter the amount of energy (W) for dosage The unit depends on the chosen reference mode. These setting and input can be defined on input 1 only, valid for all three register tests. In case x?x. is chosen, the unit is shown Copy parameters from field x (1,2,3) to field y (1,2,3) The copy function is enabled, if the regions of two fields are selected at the same time. E.g. copy settings of field 1 to field 2 Activate field 1 The red frame is displayed around the region of field 1. Activate region of field 2 and activate copy function The red frame is displayed around the region of field 2. The frame around region of field 1 becomes blue. The copy key is enabled. By pressing the copy key all settings are copied from the field with the blue frame to the field with the red frame. The copy function can be repeated, by selecting the region of field 3 or field 1. The last input region selected always becomes the copy destination. The field region selected previously is the copy source PTS 3.1 C Operation Manual Page 117/202