Download User manual
Transcript
TS-CV-DC Project Document No./ MP5 No 127.50/FCUL-00009 Table 2: TEST B Time HH:MM 9:21 9:30 15:35 15:36 8:30 10:10 10:11 12:25 14:30 14:40 18:00 18:05 19:05 18:55 8:37 Ambient T °C T set-point °C 23.2 23.2 20.1 20.0 20.0 23.0 24.0 24.0 22.0 22.0 22.0 23 20 0 0 -5 -5 -5 -10 -10 -10 -15 -15 -20 -20 -20 -20 Cooling Plant T measured El. power °C % of 4.5 kW 23.2 Environmental Chamber T1 T2 RH °C °C % 24.3 24.6 41 El. power kW -2.6 98 4.41 7.6 5.8 20 -5.0 -5.0 86 88 3.87 3.96 4.5 4.4 2.5 2.1 20 20 -9.9 -10.0 52 50 2.34 2.25 1.9 1.6 -0.9 -1.1 20 1 -15.0 26 1.17 -2.4 -5.4 - -19.8 -20.1 -20.1 0 2 6 0.00 0.09 0.27 -4 -5.7 -6.7 -7.2 -8.9 -9.6 - Cooling unit performances on the Environmental Chamber y = 0.25x + 5.00 5.0 4.5 Cooling Power [kW] 4.0 3.5 3.0 2.5 2.0 1.5 1.0 Test B Test A 0.5 0.0 0 -5 -10 -15 -20 -25 Set Temperature on Controller [°C] 3. MAINTENANCE Preventive maintenance must be foreseen for some of the equipments of the cooling unit. The table below shows an indicative maintenance procedure list: Equipment Condition Action Spare Pump After 1 year Check of the shaft seal (presse etoupe) – ev. Change Shaft seal (to be bought) Filter After 1 year Clean the filter - Connections After 1 year Check the connections 6/6 tightness of the -