Transport, Storage and Handling




The balancer packaging consists of a wooden crate and pallets. Before installation, the balancer
must be transported in its original packing by inserting the forks of a lift truck in the relevant
channels in the pallet, making sure that the machine is maintained in the position indicated on
the outer packing(fig.1).
Machine packing dimensions

Length 1060mm

Depth 760mm

Height 1200mm
Shipping weight with packing 132Kg
Ambient conditions in place of storage:

Relative humidity form 20% to 95%

Temperature from -10 to +60℃.
Attention
Do not place other items on top of the two packs, as this may cause damage.
After installation, the machine can be moved using the following methods:
 With a crane, using special equipment that holds the machine at the lifting points(fig.1a);
 Positioning the machine on its original pallet, securing it with the original devices and then
lifting the pallet with the lift truck.
Attention
Always unplug the power supply lead from the socket before moving the machine.
Warning
Never apply force to the spin shaft when moving the machine.
Installation
Warning
Take the utmost care when unpacking, assembling, and setting up the machine as described in
this heading.
Failure to observe these instructions can lead to damage to the machine and injury to the
4