Download E2 Host Manual

Transcript
Warning
It is crucial that you read this entire section prior to performing a Force
switchover.
Performing this command forces the standby Matrix card in the EXS Switch to become
active. When the switchover occurs, board status messages are sent from the EXS Switch to the
new active Host.
After the board status messages have been received from the Matrix card, the Host will delay
approximately one minute prior to running the startup routine. This can be easily monitored by
watching the debug screen. When a system is first brought on line (Host systems active), a
forced switchover should be performed.
Warning
If you use Force switchover to manually switch over from the active Host to the
standby Host, you will lose all calls being set up.
To verify that the switchover was successful, do the following:
1.
Query a channel from the now active Host. Verify that the Host can communicate
with the EXS Switch.
2.
Query a channel from the now standby Host. An "invalid matrix state" message
should appear on the screen.
Page 252