Download Facilities Services Construction Standards June 2012
Transcript
Division 14 – Conveying Systems Page 14 20 00-10 signals, pull sheets, and diagnostic and/or trouble-shooting guide shall be furnished to Oregon State University. 02. Submit a complete list of all items to be furnished and installed under this section. Included manufacturer’s specifications, catalog cuts, and other data to demonstrate compliance with the specified requirements. 03. Submit complete shop drawings for all work in this section, showing dimensions and locations of all items including supporting structure and clearances required. 04. Submit two complete clean sets of drawing prints and specifications with “asbuilt” conditions marked in crisp red ink. Sign and attest to the documents as reflecting all conditions “as-built.” 05. Provide 4 copies of Operation and Maintenance Manuals, Installation Manuals and Parts Manual necessary for full servicing of the elevator and microprocessor. C. Quality Assurance 01. Elevator installer is responsible for quality assurance and insuring that all systems related to the function of the elevator are complete and functioning properly. D. Maintenance 01. Starting at the time of substantial completion of the complete project, provide complete systematic inspection and maintenance of the elevator for a period of 12 months. Furnish trained experts and equipment to check, adjust, lubricate, and otherwise maintain the elevator in operation without defects or deterioration. Replace or repair materials and parts which become defective or deteriorated for any reason except through abuse or misuse by OSU. This time frame will start with final inspection of the elevator by the state of Oregon. E. Use of Elevator 01. The elevator shall not be used temporarily for building construction purposes unless specifically allowed by the Owner. General contractor responsible for damages and repairs. 02. If the Contractor is allowed to use the elevator prior to Substantial Completion of the project, the warranty and service period shall not be compromised and shall begin when substantial completion is achieved. Final inspection by the state of Oregon is when OSU takes possession. F. Acceptable elevator manufacturers are: 01. Kone Elevator Company 02. Motion Control 03. Otis Elevator Company 04. Thyssen Krupp 05. All companies with non-proprietary equipment G. Attributes (Traction Elevator) 01. Traditional machine room set up at top of hoistway 02. Capacity: TBD Revised June 2012 90