Download - Nucleonix
Transcript
A Description HV at HV OUT Expected +700V DC Ripple < 500 mV Observed OK/NOT OK Check the functioning of the unit as per procedure i.e., Doserate Serial communication tested (optional) Put the unit under 72 hours burn-in test and repeat the above process to check the proper functioning of the unit. OK/NOT OK OK/NOT OK Over range test passed 10 times Over range test passed 20 times OK/NOT OK OK/NOT OK Calibration Test with standard source model 773, source : Cs -137 (161.5 mCi) S.No. 1. 2. 3. 4. 5. 6. Expected value ( R/hr) OK/NOT OK OK/NOT OK Observed Value ( R/hr) Dropping test from height of 1 meter 6 times on Thermo-Cole and recheck for proper operation. TESTED BY : APPROVED BY : DATE : DATE : 19 OK/NOT OK