Download FE/PWO System Installation
Transcript
FE/PWO SYSTEM INSTALLATION • Statistically significant downward trend in fluoride concentrations in the UGS, intermediate, and deep zones over time. • Reduction of total fluoride mass in shallow and intermediate zone groundwater. • Achievement of National Pollutant Discharge Elimination System (NPDES) requirements for fluoride and other constituents of concern prior to discharge to the Columbia River. The elements required under Section V, Task 3 in Attachment 2 (Scope of Work for RMC Superfund Site August 2005) of the Groundwater UAO are summarized in this final report. The Administrative Order on Consent (AOC) requires that the final report present a goodfaith estimate of total costs; a description of the remedial action system and modifications; a description of remedial action performance and monitoring; and appendixes containing all relevant information. This final report is organized into the following sections: • • • • • • • • 1-2 Section 1: Introduction Section 2: FE/PWO System Installation Section 3: FE/PWO System Modifications Section 4: Performance Monitoring Section 5: Operations and Maintenance Section 6: Costs Section 7: Certification Appendixes PDX/062970001.DOC