Download Electrical Guide Specifications FINAL 0510
Transcript
generator shall operate properly inside the enclosure at rated (full) load with the outdoor ambient temperature up to 110 degrees Fahrenheit. The enclosure will be wind rated in “ miles per hour”by the manufacturer in accordance with the Wind-Borne Debris Region map published in the current Florida Building Code. PART 3 - EXECUTION 3.1 INSTALLATION A. 3.2 Install in accordance with manufacturer's instructions. FIELD QUALITY CONTROL A. Provide field inspections and testing. B. Load and Bank Tests: 1. A load bank test will be performed at the Substantial Completion. This test shall be performed with resistive load banks, in the presence of the engineer and AHJ. The test shall be performed during regular business hours only - Monday - Friday, 8:00 AM to 5:00 PM. a. b. c. d. 0.5 hour 50% 0.5 hour 75% 3 hours 100% 10 minutes cool down 2. During test a written log shall be maintained at 15-minute intervals with the following: a. b. c. d. e. f. g. h. i. C. 3.3 Ambient Air Temperature Amperes Hertz Oil Pressure Water Temperature Battery Charging Exhaust Stack Temperature Noise Level in dba (each side) Fuel for load test to be included in bid Test the alarm and shutdown circuits by simulating the faults, temperatures, and liquid levels. Verifying the alarm lights energize and the alarm horn sounds. Also verify the alarm silence feature works properly. MANUFACTURER'S FIELD SERVICES A. The manufacturers field service representative shall visit the job site a minimum of three times (sign in each time) after construction begins to coordinate the