INSTALLATION AND SETUP MODEL 700 3-1 INSTALLATION AND SETUP 3- This section provides instructions for installing and setting up the Model 700 Gas Chromatograph (GC) System for Zone 1/ Division I environments. This procedure involves the following steps: • • • • • • • • • 3.1 observe precautions and warnings plan site location obtain supplies and tools install GC wiring install GC sample and gas lines perform leak checks purge carrier gas lines purge calibration lines start up GC system PRECAUTIONS AND WARNINGS DANGER TO PERSONNEL AND EQUIPMENT Install and operate all equipment as designed and is compliant with all safety requirements. The “Seller” does not accept any responsibility for installations of the Model 700, or any attached equipment, in which the installation or operation thereof has been performed in a manner that is negligent and/or non-compliant with applicable safety requirements. SEP 2005 Precautions and Warnings