Download User Manual
Transcript
Argus User Guide Section 5 : Project Plots This drop-down selection box holds all the project graphs that have been created by the administrator. These graphs are configured to display a time-period ranging from the newest / latest measurement to a certain amount of days ago. This way the graphs will always show the latest developments in measurement results. Please note: ARGUS re-calculates all measurement points (the server – not your PC) from raw data to engineering-units, hence the creation of a graph could take some time. After you selected a graph a new window will be opened in which the graph is displayed: The graph is an image (no measurement data is transferred to your PC), which you can download to your PC by right-clicking your mouse and selecting ‘Save Image As’. It is possible to zoom-in on the graph by left-clicking your mouse once on a certain area of the graph. Move your mouse to another position on the graph and click again with the left mouse button. The area you have selected will form the basis for a new graph. The scales are adjusted to fit the area you selected. 21 ITM Limited User Manual