All tests at site shall be performed in the sequence required by the construction and commissioning programme. The Contractor shall prepare itemised and detailed testing and commissioning schedule. The schedule shall be completed by the Contractor and signed by the Architect’s Representative during the tests and, after signature, shall be collated and presented to the Architect for approval. The Contractor shall also supply calibrated instrument as detailed in Annex III. The instrument shall be calibrated by laboratories accredited by the Hong Kong Laboratory Accreditation Scheme (HOKLAS) or other recognized accredited laboratories. The calibration shall be made against certified equipment having a known valid relationship to internationally or nationally recognized standards. Where no such standards exist, the basis used for calibration shall be documented. In such cases, the laboratories shall provide satisfactory evidence of correlation of results, for example by participation in a suitable programme of inter – laboratory comparisons or proficiency testing. ft The entire installation shall be commissioned and tested in accordance with the latest edition of “Testing and Commissioning Procedure for Broadcast Reception Installation in Government Buildings, Hong Kong Special Administrative Region”. D ra The Contractor shall record all data and information gathered during all inspections, testing and commissioning and produce reports to the Architect within 3 weeks after the inspection, testing and commissioning records shall bear the names and signature of the representatives of the Architect and maintenance agent, who witness the inspections, testing and commissioning. Upon completion of such T & C procedure, the Contractor shall complete and sign a testing and commissioning certificate as shown in the “Testing and Commissioning Procedure for Broadcast Reception Installation in Government Buildings, Hong Kong Special Administrative Region”. The Contractor at their own expense shall rectify all defects in performance, material and workmanship before the installation is accepted. Section D1 Page 2 of 2 BRI_GS 2012 Edition