Download Model 2010 Multimeter

Transcript
Calibration Command Reference
B-7
:NDUE (:CALibration:PROTected:NDUE)
Purpose
To send the next calibration due date to the instrument.
Format
:cal:prot:ndue <year>, <month>, <day>
Parameters
<year> = 1995 to 2094
<month> = 1 to 12
<day> = 1 to 31
Query format
:cal:prot:ndue?
Response
<year>, <month>, <day>
Description
The :NDUE command allows you to store the date when calibration is next
due in instrument memory. You can read back the next due date from the
instrument over the bus by using the :NDUE? query or the front panel CAL
menu.
Note
The next due date parameters must be delimited by commas.
Examples
:CAL:PROT:NDUE 1996,12,16
:CAL:PROT:NDUE?
Send due date (12/16/96).
Request due date.