Download Trane GETB User's Manual

Transcript
Dimensions
GET 009-036
12 1/2"
(318)
8" (203)
S
D
3 3/4"
(95)
VARIES DEPENDENT
ON RISER O.D.
009, 012
B
C
16 1/4" (413) 16 1/4" (413)
8 1/8" (206)
D
E
F
39 1/8" (994)
14 3/4" (375)
3/4" (19)
015-018
18" (457)
20" (508)
10" (254)
40 5/8" (1032) 18 3/4" (476)
3/4" (19)
024-036
24" (610)
24" (610)
12" (305)
49 5/8" (1260) 22 5/8" (575)
3/4" (19
1" (25.4)
SUPPLY
G
11" (279) FOR 80" (2032) CABINET HEIGHT
3" (76) FOR 88" (2235) CABINET HEIGHT
H
SUPPLY-AIR OPENINGS AND RISER LOCATIONS CANNOT
BE ON THE SAME SIDE OF THE UNIT.
J
RISER LOCATION CAN BE ON ANY SIDE EXCEPT FRONT,
AND MAY BE SUPPLIED BY TRANE OR BY OTHERS.
DRAIN
1/2" (12.7) O.D.
ELECTRIC CONDUIT
1" (25.4)
B
TOP
A
RETURN
OPTIONAL
DUCT OPENING
1" (12.7) DUCT
COLLAR
1"
(25.4)
12 1/2"
(318)
8" (203)
3 3/4"
(95) R
GET
SWAGE 3" (76)
A
G
UNITS WITH TOP DISCHARGE ARE 80" (2032) IN HEIGHT
ALL OTHER UNITS ARE 88" (2235) IN HEIGHT
LOW VOLTAGE
CONNECTION BOX
FOR THERMOSTAT
C
CONTROL BOX
60" (1524)
THROWAWAY
FILTER
CHASSIS
ACCESS
PANEL
4 3/4"
(121)
DRAIN
CONNECTION
3/4" (19) O.D.
F
FRONT
WSHP-SVN08B-EN
2 1/2" (63.5)
D
FROM 96" (2438)
TO 120" (3048)
1 1/4" (32)
SUPPLY-AIR
OPENING
RISER CONNECTION
1/2” (13) NPTE = 009-018
3/4” (19) NPTE = 024,036
NOTE:
RIGHT RISER
LOCATION SHOWN
IN FRONT AND RIGHT
VIEWS.
E
RIGHT SIDE
7