Download Bryant TSTATBBN2S01-C Unit installation
Transcript
GENERAL INFORMATION Model Nomenclature 1 2 3 4 5 6 7 8 9 10 11 12 5 0 Y B V 0 3 6 L L A 3 5 1 SERIES: SIZE: YBV = VERTICAL UPFLOW TWIN 036 042 048 060 072 PACKAGING: 1 = SINGLE PACK (DOMESTIC) REVISION LEVEL: 5 = CURRENT REVISION AIR FLOW CONFIGURATION: OPTION RETURN L R LEFT RIGHT DISCHARGE FILTER TOP TOP 1.000" 1.000" CONTROLS: L = CXM W/ICM VOLTAGE: 3 = 208V, 230V/1PH/60Hz HEAT EXCHANGER OPTIONS: A = COPPER WATER COIL, E-COATED AIR COIL B = COPPER WATER COIL, HOT WATER GENERATOR, E-COATED AIR COIL J = CUPRO-NICKEL WATER COIL, E-COATED AIR COIL K = CUPRO-NICKEL WATER COIL, HOT WATER GENERATOR, E-COATED AIR COIL Rev.: 04/18/04D Inspection Upon receipt of the equipment, carefully check the shipment against the bill of lading. Make sure all units have been received. Inspect the carton or crating of each unit, and inspect each unit for damage. Assure the carrier makes proper notation of any shortages or damage on all copies of the freight bill and he completes a common carrier inspection report. Concealed damage not discovered during unloading must be reported to the carrier within 15 days of receipt of shipment. If not filed within 15 days, the freight company can deny the claim without recourse. Note: It is the responsibility of the purchaser to file all necessary claims with the carrier. Notify the Customer Service of all damage within fifteen (15) days of shipment. Introduction GT-X Geothermal Heat Pump units are typically installed in a floor level closet, basement, or in a small mechanical room. The installation site chosen for these units must allow adequate clearance for maintenance and servicing of the unit without its removal from the installation location. Storage CAUTION: DO NOT store or install units in corrosive environments or in locations subject to temperature or humidity extremes (e.g., attics, garages, rooftops, etc.). Corrosive conditions and high temperature or humidity can significantly reduce performance, reliability, and service life. Always move units in an upright position. Tilting units on their sides may cause equipment damage. Equipment should be stored in its shipping carton in a clean, dry area. Store units in an upright position at all times. Stack vertical units a maximum of 2 units high. DO NOT remove equipment from shipping cartons until equipment is required for installation. Unit Protection Cover units on the job site with either shipping cartons, vinyl film, or an equivalent protective covering. Cap the open ends of pipes stored on the job site. In areas where painting, plastering, or spraying has not been completed, all due precautions must be taken to avoid physical damage to the units and contamination by foreign material. Physical damage and contamination may prevent proper start-up and may result in costly equipment cleanup. Examine all pipes, fittings, and valves before installing any of the system components. Remove any dirt or trash found in or on these components. Page 2