Download Simplicity 1693407 Specifications
Transcript
Overview, Continued Help If technical assistance is required during performance of maintenance functions, or if parts are being returned, the customer should contact Siemens at the addresses and/or phone numbers provided at the beginning of this manual. How to Use This Chapter Before performing a procedure first read it through. It is recommended that a regular scheduled daily, weekly or monthly maintenance program be established. By doing so, the downtime of the Maxum II analyzer will be reduced and the system will operate at optimum analytical efficiency. Siemens recommendations for routine maintenance are listed in table 4-1. These recommendations are intended as a guideline. Actual maintenance may change depending on application and the environment in which the Maxum II operates. Note: The tasks described below are provided as a suggested guideline for routine maintenance. Requirements for a particular analyzer will depend on environment, location of the analyzer, available resources, and the specific characteristics of the application. Task Frequency Backup of database Weekly as well as before performing any maintenance that requires the analyzer to be powered down. Status Check – Includes checking alarms, utility bottle pressures, flow rates, and oven temperature. Daily. Visual Inspection (walk by) Daily or weekly (may vary depending on location, application and. environment) Interior Electronic Enclosure Visual Inspection (open cabinet and check for moisture and/or contamination) Monthly (may vary depending on location, application and environment) Table 4-1: Recommended Routine Maintenance 4-2 A5E31405710001