Download APPENDIX AVI212 Specifications
Transcript
Gaia GAIA.ASU.SP.ESM.00007 Issue 2.00 Page 69 of 79 7.4 Verification Process AVI-2102/CREATED/R The verification process activities shall be incrementally performed at different levels and in different stages applying a coherent bottom-up concept and using a suitable combination of different verification methods. AVI-2103/CREATED/R The verification process flow shall be subdivided into the following steps: Identification and classification of all the requirements to be verified Selection of verification criteria (methods/levels/stages) against identified requirements Establishing the planning for the associated verification activities Obtain customer concurrence Performance of verification tasks and verification control Completion of verification control and evidence for verification close-out Customer review and final approval. 7.5 Project Specific Verification Requirements AVI-2120/CREATED/ Requirements verification shall be controlled in accordance with the following methods: (listed in order of preference) Test Analysis Review of Design Inspection Similarity AVI-2132/CREATED/R The contractor shall apply the verification methods, as defined in this specification, for each requirement (see Section 1.2). AVI-2133/CREATED/R The subcontractor shall establish the verification documentation as defined in the Document Delivery List of the Avionics SCOE SOW. AVI-2134/CREATED/R The subcontractor shall report the verification status for each requirement. Astrium Ltd owns the copyright of this document which is supplied in confidence and which shall not be used for any purpose other than that for which it is supplied and shall not in whole or in part be reproduced, copied, or communicated to any person without written permission from the owner. GAIA.ASU.SP.ESM.00007 (Avionics SCOE Req Iss 2).doc