Download RIDGID R3121 Technical data
Transcript
Preparation for commissioning 1 Before commissioning observe the conditions described in this chapter. ● The preconditions for commissioning must be fulfilled (in the next chapter). ● The relevant checklist must have been worked through. ● The bus components required for communication must be wired up. ● DRIVE-CliQ wiring rules must be adhered to. ● ON-OFF responses of the drive 1.1 Requirements for commissioning The following are necessary for commissioning a SINAMICS S drive system: ● STARTER commissioning tool ● An interface, e.g. PROFIBUS, PROFINET, CAN bus or USS (RS232-C) ● Completely wired-up drive line-up (see the Manual) The following diagram shows a sample configuration with booksize and chassis components. Commissioning Manual Commissioning Manual, (IH1), 01/2011, 6SL3097-4AF00-0BP1 13