Download Integrated Modelling Methodology - Version 2.0
Transcript
D 1.6 – Integrated Modelling Methodology - Version 2.0 8 Appendix 2: Statements in the Evaluation questionnaires of P2 and P3 8.1 Phase 0. Scope and Boundaries 8.1.1.1 Feedback on the IMM for P2 General o “A 2-day workshop is necessary in this phase”: 1 Coach (SAP) Objectives & Explanations o “The objectives of the phase were clear”: 3 KE (CCI, EADS, ISN), 1 Coach (SAP) o “The objectives were not clear” 1 KE (CNM) o “The explanations were clear” 1 KE: ISN o “There was a lack of clear understanding how APOSDLE works”: 1 KE (CCI) o “There was a lack of good examples how a model should look like”: 2 KE (CCI, EADS) o “There was a lack of good examples of what is an adequate domain”: 1 KE (ISN) o “We had no clear criteria which domain is suitable for APOSDLE”: 1 Coach (KC) o After the models for P2 were finished there was a better understanding of what is an appropriate APOSDLE domain: 1 KE (ISN) Collection of documents o “We had difficulties in finding crucial documents” 1 KE (ISN) o “The collection of documents is time-consuming because documents are not centrally stored”: 2 KE (CCI, EADS) o “The knowledge about the domain is not documented”: 1 KE (EADS) o “There is no explicit teaching and learning material available”: 1 KE (CCI) o “There are no workflow descriptions available”: 1 KE (CCI) o “In the end, knowledge engineers found more resources than they had expected”: 1 Coach (KC) Knowledge elicitation techniques o “The knowledge elicitation techniques were adequate”: 1 Coach (SAP) o “The process and domain scribble were useful”: 1 KE (ISN) © APOSDLE consortium: all rights reserved page 63