Download USER MANUAL

Transcript
Document:
Version:
Date:
User Manual
1.0
August 12, 2002
ROLLBACK PROJECT CHANGES
When project manager rolls back the changes of the project in “DRAFT” status, then project receives
status “CURRENT” with the parameters that the project had before the project was changed.
VIEW ASSIGNED RESOURCES
Project manager can view resources that were assigned to his or her project during the resources
assignment process. During this action the order has status “WAITING FOR RESOURCES
ASSIGNMENT”. It means that not all of the unit managers have finished resources assignment.
During the viewing assigned resources project manager will work with the following screens:
•
View resources request screen;
•
Resources screen.
The description of these screens and their parameters see in corresponding sections.
ASSIGN RESOURCES
During the resources assignment process unit manager will work with the following screens:
•
View resources request screen;
•
Resources screen;
•
Search resources screen.
The description of these screens and their parameters see in corresponding sections.
4.4.2 PROJECT GENERAL INFORMATION SCREEN
Roles that can
view this page
•
•
Projects coordinator
Project Manager
“Project general information” screen is the same as “Order general information” screen with the
following differences:
•
Approving person field is no longer editable;
•
Project manager field is no longer editable;
•
Customer field is no longer editable.
It is not possible to change these project attributes in the current project.
4.4.3 PROJECT PHASES AND RESOURCES SCREEN
Roles that can
•
Projects Coordinator
Copyright © GET Information Technology GmbH, 2002
Page 51 of 80