Download Polycold Closed Loop Gas Chiller (825130)
Transcript
5. Screw in other three seismic anchor/jack screws from top and put the pad from bottom. For these thread the rod in from the top, keeping machined flats at top. After threading the rod though the frame and with about 2 inches of exposed thread below the frame, install pad. Use a wrench on the pad and the flats to tighten. 825130-00 REV B Page 71