Download VERTICOOL - Curlin, Inc.
Transcript
User’s Manual TKO VertiCool Vertical Leveler Dock Doors TRACK INSTALLATION (continued) FLOOR TO TRACK BRACKET INSTALLATION 1. 2. 3. 4. Mount floor to track brackets to both sides of track with the hardware supplied. Check and maintain proper track spacing. Mount brackets to floor with appropriate hardware for floor material (NOT supplied). Proceed to upper track installation: Once lower tracks are securely mounted and spaced, prepare to install upper tracks. See pages 12 through 25 for upper track installation instructions. FLOOR TO TRACK BRACKET INSTALLATION NOTES: 1. MOUNT FLOOR TO TRACK BRACKETS TO BOTTOM SIDE OF TRACK WITH HARDWARE SUPPLIED. 2. CHECK AND MAINTAIN PROPER TRACK SPACING. 3. MOUNT BRACKETS TO FLOOR WITH APPROPRIATE HARDWARE FOR FLOOR MATERIAL (NOT SUPPLIED). * INCLUDED IN HARDWARE BAG 30-00574HRDW, FLOOR TO TRACK BRACKET. ** INCLUDED IN KIT PART NO. 30-00085FLOOR TO TRACK BRKT KIT. BOLT, CRG, 1/4-20 X 3/4" 10-00026* FLOOR ANCHOR BOLT NOT INCLUDED. NUT, FLNG, 1/4-20 10-00005* FLOOR TO TRACK BRACKET 20-00007** 15-00084 R5 08/12 VC BOTTOM STRT STEEL TRACK (RIGHT HAND SIDE SHOWN) © 2012 4Front Engineered Solutions, Inc. Page 11