Download 200PEVP01
Transcript
PEV PULSEContents 2.3 CHAP. 2 - Installation INSTALLATION OF BOARD Fig. 1: Install the module on the DIN guide and close the bottom clamp to hold it in place. Make all the electrical connections with reference to the diagrams of the relative model (see the relative tables in the ANNEXES). During the cabling process, it is advisable to keep the power conductors isolated from the signal conductors. Page 6 USER AND MAINTENANCE MANUAL Rev. 01-14